List of schemes
| Ward | Road | Type | Info | Start Date | Work Stream |
|---|---|---|---|---|---|
| Aspley | Sherborne Road | Resurfacing | Complete | 20/10/2025 | LTP 25/26 |
| Aspley | Withern Road | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
| Aspley | Coleby Road | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
| Aspley | Beckley Road | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Aspley | Fenwick Road | Resurface | Complete | 20/01/2025 | SfP 24/25 |
| Aspley | Deepdene Way | Resurface | Complete | 18/11/2024 | SfP 24/25 |
| Aspley | Winsford Close | Resurface | Complete | 13/01/2025 | SfP 24/25 |
| Aspley | Maltby Close | Resurface | Complete | 13/01/2025 | SfP 24/25 |
| Aspley | Maltby Close | Resurface | Complete | 13/01/2025 | SfP 24/25 |
| Aspley | Limetree Avenue | Residents Parking Scheme | Complete | 15/06/2025 | SfP 24/25 |
| Aspley | Ward wide | Bin Replacement | Complete | 10/02/2025 | SfP 24/25 |
| Aspley | Tiverton Close | Footway Resurface | Complete | 13/01/2025 | SfP 24/25 |
| Aspley | Ward Wide | Planned Patching | Complete | 01/02/2025 | SfP 24/25 |
| Basford | Llanberis Grove | Resurfacing | Complete | 25/07/2025 | LTP 25/26 |
| Basford | Stoneycroft Road | Resurfacing | Live | 12/11/2025 | EMCCA 25/26 |
| Basford | Barlock Road | Retread | Complete | 08/04/2025 | LTP 25/26 |
| Basford | Vernon Road | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Basford | Newport Drive | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Basford | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Basford | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Basford | Bowness Avenue | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Basford | Greenwich Avenue | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Basford | Mount Pleasant | Micro Asphalt | Complete | 07/06/2024 | LTP 24/25 |
| Basford | Marlowe Avenue | Micro Asphalt | Complete | 07/06/2024 | LTP 24/25 |
| Basford | Whitemoor Road | Micro Asphalt | Complete | 08/04/2024 | LTP 24/25 |
| Basford | Alpine Street | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
| Basford | Stockhill Lane | Micro Asphalt | Complete | 11/04/2024 | LTP 24/25 |
| Basford | Bulwell Lane | Resurface | Complete | 06/07/2025 | SfP 24/25 |
| Basford | Heatherly Drive | Resurface | Complete | 10/02/2025 | SfP 24/25 |
| Basford | Broadhurst Avenue | Resurface | Complete | 21/01/2025 | SfP 24/25 |
| Basford | Percy Street | Micro Asphalt | Complete | 10/04/2024 | LTP 24/25 |
| Basford | Ward Wide | Parking Restrictions | On site | 30/09/2025 | SfP 24/25 |
| Basford | Park Lane | 2 New Bollards | Complete | 15/01/2025 | SfP 24/25 |
| Basford | Ward Wide | Bin Replacement | Complete | 17/02/2025 | SfP 24/25 |
| Basford & Sherwood | Valley Road | Micro Asphalt | Complete | 18/03/2025 | LTP 24/25 |
| Berridge | Arno Avenue | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
| Berridge | Wiverton Road | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
| Berridge | Reigate Road | Micro Asphalt | Complete | 19/08/2025 | EMCCA 25/26 |
| Berridge | Silverdale Road | Micro Asphalt | Complete | 19/08/2025 | EMCCA 25/26 |
| Berridge | Exeter Road | Resurfacing | Live | 10/11/2025 | LTP 25/26 |
| Berridge | Pelham Avenue | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Berridge | Ward Wide | Patching | In Development | To Be Confirmed | SfP 25/26 |
| Berridge | Myrtle Avenue | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Berridge | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Berridge | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Berridge | Lamcote Street | Micro Asphalt | Complete | 03/04/2024 | LTP 24/25 |
| Berridge | Second Avenue | Micro Asphalt | Complete | 06/04/2024 | LTP 24/25 |
| Berridge | Gladstone Street | Micro Asphalt | Complete | 07/04/2024 | LTP 24/25 |
| Berridge | Premier Road | Micro Asphalt | Complete | 07/04/2024 | LTP 24/25 |
| Berridge | Maxwell Close | Micro Asphalt | Complete | 05/04/2024 | LTP 24/25 |
| Berridge | Hadbury Road | Resurface | Complete | 24/02/2025 | SfP 24/25 |
| Berridge | Egypt Road | Resurface | Complete | 03/02/2025 | SfP 24/25 |
| Berridge | Suez Street Area | Dropped Crossing Improvements | Complete | 19/08/2025 | SfP 24/25 |
| Berridge | Ward Wide | Parking Restrictions | On site | 01/08/2025 | SfP 24/25 |
| Berridge | Wimbledon Road Area | Resident Parking Scheme and Parking Restrictions | Complete | 01/08/2025 | SfP 24/25 |
| Berridge | Charlesworth Avenue | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Bestwood | B6004 Arnold Road | Micro Asphalt | Complete | 29/09/2025 | EMCCA 25/26 |
| Bestwood | Southglade Road | Resurfacing | Complete | 28/07/2025 | LTP 25/26 |
| Bestwood | Beckhampton Road | Resurfacing | Complete | 13/10/2025 | LTP 25/26 |
| Bestwood | Prendwick Gardens | Resurfacing | Programmed | 02/12/2025 | EMCCA 25/26 |
| Bestwood | Morrell Bank | Resurfacing | Complete | 28/07/2025 | SfP 25/26 |
| Bestwood | Elsworth Drive | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Bestwood | Barent Close | Resurfacing | Complete | 28/07/2025 | SfP 25/26 |
| Bestwood | Morrell Bank Estate | Public Realm Improvements | In Development | To Be Confirmed | SfP 25/26 |
| Bestwood | Lytham Gardens | Micro Asphalt | Complete | 17/04/2024 | LTP 24/25 |
| Bestwood | Mildenhall Crescent | Resurface | Complete | 17/02/2025 | SfP 24/25 |
| Bestwood | Southglade Road | Resurface | Complete | 28/07/2025 | SfP 24/25 |
| Bestwood | Cottam Drive / Cottam Gardens | Micro Asphalt | Complete | 17/03/2025 | SfP 24/25 |
| Bestwood | Elmbridge | Micro Asphalt | Complete | 26/03/2025 | SfP 24/25 |
| Bestwood | Ward Wide | Planned Patching | Complete | 01/12/2024 | SfP 24/25 |
| Bestwood | Ward Wide | Bin Replacement | Complete | 24/02/2025 | SfP 24/25 |
| Bestwood | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Bilborough | Rosedale Drive | Micro Asphalt | Complete | 23/03/2025 | LTP 25/26 |
| Bilborough | Woodhouse Way | Resurfacing | Complete | 13/10/2025 | LTP 25/26 |
| Bilborough | Hucknall Road | Micro Asphalt | In Development | To Be Confirmed | LTP 24/25 |
| Bilborough | Bracebridge Drive | Resurfacing | Complete | 11/08/2025 | LTP 24/25 |
| Bilborough | Strelley Road | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Bilborough | Cockington Road | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Bilborough | Greystoke Drive Area | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Bilborough | Strelley Road | Resurface | Complete | 17/02/2025 | LTP 24/25 |
| Bilborough | Chingford Road | Resurface | Complete | 31/07/2025 | SfP 24/25 |
| Bilborough | Woodhouse Way | Resurface | Complete | 06/05/2025 | SfP 24/25 |
| Bilborough | Burnside Road | Micro Asphalt | Complete | 24/03/2025 | SfP 24/25 |
| Bilborough | Glaisdale Drive | Planned Patching | Complete | Summer 2025 | SfP 24/25 |
| Bilborough | Wollaton Vale | Footway Resurface | Complete | 30/06/2025 | SfP 24/25 |
| Bulwell | Minerva Street | Micro Asphalt | Complete | 30/08/2025 | EMCCA 25/26 |
| Bulwell | Merchant Street | Micro Asphalt | Complete | 30/08/2025 | EMCCA 25/26 |
| Bulwell | Hazel Street | Micro Asphalt | Complete | 30/08/2025 | EMCCA 25/26 |
| Bulwell | Sellerswood Drive | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell | Bardney Drive | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell | Barry Street | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell | Moorbridge Cottages | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell | Highbury Road | Footway Resurface | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell | Squires Avenue | Resurface | Complete | 07/04/2025 | SfP 24/25 |
| Bulwell | Lime Street / Muriel Street | Resurface | Complete | 29/11/2024 | SfP 24/25 |
| Bulwell | Squires Avenue | Resurface | Complete | 02/04/2025 | SfP 24/25 |
| Bulwell | Armstrong Road | Micro Asphalt | Complete | 22/03/2025 | SfP 24/25 |
| Bulwell | Ward wide | Planned Patching | Complete | 01/12/2024 | SfP 24/25 |
| Bulwell Forest | Shakespeare Street | Resurfacing | Complete | 11/08/2025 | LTP 24/25 |
| Bulwell Forest | Bestwood Park Drive West | Resurfacing | In Development | To Be Confirmed | EMCCA 25/26 |
| Bulwell Forest | Bestwood Road | Retread | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell Forest | Flaxton Way | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell Forest | Revelstoke Way | Patching | In Development | To Be Confirmed | SfP 25/26 |
| Bulwell Forest | Brora Road | Micro Asphalt | Complete | 16/04/2024 | LTP 24/25 |
| Bulwell Forest | Ridgeway | Resurface | Complete | 03/03/2025 | SfP 24/25 |
| Bulwell Forest | St Albans Road | Resurface | Complete | 25/08/2025 | SfP 24/25 |
| Bulwell Forest | Bestwood Road | Retread | Complete | 27/03/2025 | SfP 24/25 |
| Bulwell Forest | Piccadilly | Planned Patching | Complete | 01/02/2025 | SfP 24/25 |
| Bulwell Forest | Belmont Avenue | Retread | Complete | 26/03/2025 | SfP 24/25 |
| Bulwell Forest | Torkard Drive/Old Farm Road | Dropped Crossing Improvements | Complete | 18/08/2025 | SfP 24/25 |
| Bulwell Forest | Ward Wide | Planned Patching | Complete | 01/07/2025 | SfP 24/25 |
| Castle | Clumber Street | Resurfacing | Complete | 04/08/2025 | LTP 24/25 |
| Castle | Nuthall Road | Resurfacing | Complete | 07/07/2025 | LTP 24/25 |
| Castle | Hounds Gate | Footway Resurface | In Development | To Be Confirmed | SfP 25/26 |
| Castle | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Castle | Ward Wide | Dropped Crossings | In Development | To Be Confirmed | SfP 25/26 |
| Castle | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Castle | Plumptre Street | Resurface | Complete | 10/03/2025 | SfP 24/25 |
| Castle | St James's Terrace | Resurface | Complete | 15/03/2025 | SfP 24/25 |
| Castle | Old Lenton Street | Junction Realignment | Complete | 15/09/2025 | SfP 24/25 |
| Castle | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| Castle | Ward Wide | New Trees/Urban Greening | Complete | 01/08/2025 | SfP 24/25 |
| Clifton East | Woodkirk Road | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
| Clifton East | Wrenthorpe Vale | Micro Asphalt | Complete | 12/08/2025 | EMCCA 25/26 |
| Clifton East | Caister Road | Micro Asphalt | Complete | 11/08/2025 | EMCCA 25/26 |
| Clifton East | Blaise Close | Micro Asphalt | Complete | 11/08/2025 | EMCCA 25/26 |
| Clifton East | Cerne Close | Micro Asphalt | Complete | 11/08/2025 | EMCCA 25/26 |
| Clifton East | Failsworth Close | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Clifton East | Woodkirk Road | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Clifton East | Gardendale Avenue | Residents Parking Scheme | In Development | To Be Confirmed | SfP 25/26 |
| Clifton East | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Clifton East | Dungannon Road | Resurface | Complete | 30/07/2025 | SfP 24/25 |
| Clifton East | Clifton Lane | Resurface | Complete | 14/07/2025 | SfP 24/25 |
| Clifton East | Oldoak Road | Resurface | Complete | 22/11/2024 | SfP 24/25 |
| Clifton East | Greencroft Area | Residents Parking Scheme | Complete | 01/08/2025 | SfP 24/25 |
| Clifton East | Farnborough Road | Raised Plateau Resurfacing | Complete | 23/06/2025 | SfP 24/25 |
| Clifton East | Ward wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| Clifton East | Middlefell Way | Slurry Seal | Complete | 18/03/2025 | SfP 24/25 |
| Clifton West | Ruddington Lane | Micro Asphalt | Complete | 21/04/2024 | LTP 24/25 |
| Clifton West | Bader Road | Micro Asphalt | Complete | 13/08/2025 | EMCCA 25/26 |
| Clifton West | Aaron Close | Micro Asphalt | Complete | 12/08/2025 | EMCCA 25/26 |
| Clifton West | Hannah Crescent | Micro Asphalt | Complete | 13/08/2025 | EMCCA 25/26 |
| Clifton West | Cribb Close | Micro Asphalt | Complete | 13/08/2025 | EMCCA 25/26 |
| Clifton West | Nobel Road, Hartness Road, Fabis Drive, Clifton Village, Lark Hill (New Rise) | Speed Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Clifton West | Wilford Cross Roads | Junction Improvements | Programmed | 01/01/2026 | SfP 25/26 |
| Clifton West | Village Road | Retread | Complete | 26/03/2025 | LTP 24/25 |
| Clifton West | Brookthorpe Way | Micro Asphalt | Complete | 19/03/2025 | SfP 24/25 |
| Clifton West | Pieris Drive | Micro Asphalt | Complete | 18/03/2025 | SfP 24/25 |
| Clifton West | Holgate | Retread | Complete | 26/03/2025 | SfP 24/25 |
| Dales | Daleside Road | Resurfacing | Complete | 02/09/2025 | LTP 25/26 |
| Dales | Avon Road | Resurfacing | Complete | 23/07/2025 | EMCCA 25/26 |
| Dales | Bewick Drive | Micro Asphalt | Complete | 18/08/2025 | EMCCA 25/26 |
| Dales | Hereford Road | Footway Resurface | In Development | To Be Confirmed | SfP 25/26 |
| Dales | Colwick Road side roads/Meadow Grove | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Dales | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Dales | Newark Crescent | Dropped Crossings | In Development | To Be Confirmed | SfP 25/26 |
| Dales | Dragon Sculpture | New Benches | In Development | To Be Confirmed | SfP 25/26 |
| Dales | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Dales | Cardale Road | Resurface | Complete | 19/08/2024 | LTP 24/25 |
| Dales | Hereford Road | Retread | Complete | 24/03/2025 | SfP 24/25 |
| Dales | Hereford Road | Resurface | Complete | 23/07/2025 | SfP 24/25 |
| Dales | Daleview Road | Retread | Complete | 31/03/2025 | SfP 24/25 |
| Dales | Bewick Drive Area | Dropped Crossing Improvements | Complete | 07/08/2025 | SfP 24/25 |
| Dales | Lord Nelson Street | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| HGA | Colville Street | Resurfacing | Live | 10/11/2025 | LTP 25/26 |
| HGA | Hampden Street | Resurfacing | Programmed | 05/01/2026 | EMCCA 25/26 |
| HGA | Dundas Close | Resurfacing | Programmed | 19/01/2026 | EMCCA 25/26 |
| HGA | Berridge Road Central | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| HGA | Ireton Street | Micro Asphalt | Complete | 06/04/2024 | LTP 24/25 |
| HGA | Bentinck Road | Resurface | Complete | 07/10/2024 | LTP 24/25 |
| HGA | Newstead Grove | Resurface | Complete | 27/01/2025 | SfP 24/25 |
| HGA | A610 Bobbers Mill Bridge | Road Safety Improvements | In Development | Summer 2026 | SfP 24/25 |
| HGA | Darley Road and Darley Avenue | Micro Asphalt | Complete | 17/03/2025 | SfP 24/25 |
| HGA | Knighton Avenue | Micro Asphalt | Complete | 25/03/2025 | SfP 24/25 |
| HGA | Ward Wide | Planned Patching | Complete | 12/12/2024 | SfP 24/25 |
| HGA | Gill Street | Dropped Crossing Improvements | Complete | 11/08/2025 | SfP 24/25 |
| HGA | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| LAWE | Orston Drive | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| LAWE | Wemyss Gardens | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| LAWE | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| LAWE | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| LAWE | Scalford Drive | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| LAWE | Ward Wide | Patching | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Bexleigh Gardens | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
| Leen Valley | Western Boulevard | Resurfacing | Complete | 07/07/2025 | LTP 24/25 |
| Leen Valley | Wilford Crescent East | Resurfacing | Complete | 15/09/2025 | LTP 24/25 |
| Leen Valley | Aberford Avenue | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Cherry Wood Drive / Spean Drive | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Dalemoor Gardens / Ascot Road / Glencairn Drive | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Oakwood Drive | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Leen Valley | Beechdale Road | HFS | Complete | 01/11/2024 | LTP 24/25 |
| Leen Valley | Aspley Lane | Micro Asphalt | Complete | 18/04/2024 | LTP 24/25 |
| Leen Valley | Holbeck Road | Resurface | Complete | 01/11/2024 | LTP 24/25 |
| Leen Valley | Wilkinson Street | Resurface | Complete | 23/09/2024 | LTP 24/25 |
| Leen Valley | Trentham Drive | Resurface | Complete | 20/03/2025 | SfP 24/25 |
| Leen Valley | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| Leen Valley | Ward Wide | Planned Patching | Complete | 01/12/2024 | SfP 24/25 |
| LWE | Selston Drive | Retread | Complete | 26/03/2025 | LTP 25/26 |
| LWE | Gregory Street | Micro Asphalt | Complete | 20/04/2024 | LTP 24/25 |
| LWE | Lenton Lane | Micro Asphalt | Complete | 02/04/2024 | LTP 24/25 |
| LWE | Hawton Crescent | Resurface | Complete | 07/04/2025 | SfP 24/25 |
| LWE | Newland Close | Resurface | Complete | 14/03/2025 | SfP 24/25 |
| LWE | Trinity Avenue / Church Avenue / Albert Road / Lois Avenue | Micro Asphalt | Complete | 22/03/2025 | SfP 24/25 |
| LWE | Scalford Drive | Micro Asphalt | Complete | 21/03/2025 | SfP 24/25 |
| LWE | Broughton Drive/Austrey Avenue | Parking Restrictions | Complete | 01/08/2025 | SfP 24/25 |
| Mapperley | Mapperley Hall Drive | Retread | Complete | 01/04/2025 | LTP 25/26 |
| Mapperley | St Jude's Avenue | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Mapperley | Ward Wide | Patching | In Development | To Be Confirmed | SfP 25/26 |
| Mapperley | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Mapperley | Tavistock Drive | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Mapperley | Dagmar Grove | Micro Asphalt | Complete | 04/04/2024 | LTP 24/25 |
| Mapperley | Mapperley Road | Micro Asphalt | Complete | 04/04/2024 | LTP 24/25 |
| Mapperley | Mapperley Rise | Micro Asphalt | Complete | 03/04/2024 | LTP 24/25 |
| Mapperley | Springwood Gardens | Retread | Complete | 25/03/2025 | LTP 24/25 |
| Mapperley | Brewsters Road | Resurface | Complete | 24/02/2025 | SfP 24/25 |
| Mapperley | Boynton Road | Micro Asphalt | Complete | 23/03/2025 | SfP 24/25 |
| Mapperley | Woodlane Gardens | Micro Asphalt | Complete | 23/03/2025 | SfP 24/25 |
| Mapperley | Eaton Street | Micro Asphalt | Complete | 23/03/2025 | SfP 24/25 |
| Meadows | Queens Drive | Resurfacing | Programmed | 19/01/2026 | LTP 25/26 |
| Meadows | St Georges Drive | Micro Asphalt | Complete | 18/08/2025 | EMCCA 25/26 |
| Meadows | Kelso Gardens | Micro Asphalt | Complete | 18/08/2025 | EMCCA 25/26 |
| Meadows | Beardsley Gardens | Micro Asphalt | Complete | 18/08/2025 | EMCCA 25/26 |
| Meadows | Saffron Gardens | Micro Asphalt | Complete | 14/08/2025 | EMCCA 25/26 |
| Meadows | Arleston Drive | Resurfacing | Complete | 14/07/2025 | LTP 24/25 |
| Meadows | Robin Hood Way | Road Safety Improvements | In Development | To Be Confirmed | SfP 25/26 |
| Meadows | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Meadows | Hobart Close | Micro Asphalt | In Development | To Be Confirmed | SfP 25/26 |
| Meadows | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Meadows | Queens Drive (Phase 1) | Resurface | Complete | 09/09/2024 | LTP 24/25 |
| Meadows | Queens Drive (Phase 2) | Resurface | Complete | 04/11/2024 | LTP 24/25 |
| Meadows | Bathley Street | Resurface | Complete | 11/03/2025 | SfP 24/25 |
| Meadows | Queen's Road | New Pedestrian Crossing | Complete | 28/07/2025 | SfP 24/25 |
| Meadows | Quayside Close/ Meadows Close and Beauvale Road | Residents Parking Scheme | In Development | 31/01/2026 | SfP 24/25 |
| Meadows | Bunbury Street | Micro Asphalt | Complete | 21/03/2025 | SfP 24/25 |
| Meadows | Burge Close | Micro Asphalt | Complete | 21/03/2025 | SfP 24/25 |
| Meadows | Bathley Street | Slurry Seal | Complete | 04/03/2025 | SfP 24/25 |
| Meadows | Robin Hood Way | Footpath Design | Complete | 01/08/2025 | SfP 24/25 |
| Meadows | Colliery Close | Surfacing and Drainage Improvements | Complete | 02/06/2025 | SfP 24/25 |
| Radford | Dorking Road | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
| Radford | Bovill Street | Micro Asphalt | Complete | 26/03/2025 | LTP 25/26 |
| Radford | Graham Street | Micro Asphalt | Complete | 08/04/2025 | EMCCA 25/26 |
| Radford | Bastion Street | Resurfacing | Programmed | 17/11/2026 | LTP 25/26 |
| Radford | St Peters Street | Urban Greening | In Development | To Be Confirmed | SfP 25/26 |
| Radford | Denman Street West | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Radford | 174 Derby Road / St Peters Street / Lonsdale Road / Hartley Road | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| Radford | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Radford | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Radford | Salisbury Street | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
| Radford | Salisbury Square | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
| Radford | Middleton Street | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
| Radford | Miall Street | Micro Asphalt | Complete | 08/04/2024 | LTP 24/25 |
| Radford | Bright Street | Micro Asphalt | Complete | 08/04/2024 | LTP 24/25 |
| Radford | Wellington Square | Micro Asphalt | Complete | 06/04/2024 | LTP 24/25 |
| Radford | Faraday Road | Micro Asphalt | Complete | 10/04/2024 | LTP 24/25 |
| Radford | Garden Street | Micro Asphalt | Complete | 07/04/2024 | LTP 24/25 |
| Radford | Balfour Road | Resurface | Complete | 10/03/2025 | SfP 24/25 |
| Radford | Douglas Road | Resurface | Complete | 24/03/2025 | SfP 24/25 |
| Radford | Norton Street | Micro Asphalt | Complete | 22/03/2025 | SfP 24/25 |
| Radford | Argyle Street | Micro Asphalt | Complete | 24/03/2025 | SfP 24/25 |
| Radford | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| Sherwood | Perry Road | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
| Sherwood | A6514 Valley Road | Micro Asphalt | Complete | 26/08/2025 | EMCCA 25/26 |
| Sherwood | Raven Avenue | Micro Asphalt | Complete | 19/08/2025 | EMCCA 25/26 |
| Sherwood | Ampthill Rise | Micro Asphalt | Complete | 19/08/2025 | EMCCA 25/26 |
| Sherwood | Devonshire Road | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Sherwood | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| Sherwood | Haydn Road Shops | Cycle Parking | In Development | To Be Confirmed | SfP 25/26 |
| Sherwood | Longdale Drive | Resurface | Complete | 12/08/2024 | LTP 24/25 |
| Sherwood | Whatton Rise / Bradmore Rise | Resurface | Complete | 06/01/2025 | SfP 24/25 |
| Sherwood | Mansfield Rd Area | Residents Parking and Car Parks Scheme | In Development | Summer 2026 | SfP 24/25 |
| Sherwood | Perry Road | Planned Patching | Complete | 31/01/2025 | SfP 24/25 |
| Sherwood | Loscoe Road | Cycleway | Complete | 01/04/2025 | SfP 24/25 |
| Sherwood | Winchester Street | Cycleway | Complete | 18/06/2025 | SfP 24/25 |
| Sherwood | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| St Ann's | Ward Wide | Parking Restrictoins | In Development | To Be Confirmed | SfP 25/26 |
| St Ann's | Linnell Street | Resurfacing | Programmed | 12/01/2026 | SfP 25/26 |
| St Ann's | Serlby Rise | Patching | In Development | To Be Confirmed | SfP 25/26 |
| St Ann's | Ward Wide | Bin Replacement | In Development | To Be Confirmed | SfP 25/26 |
| St Ann's | Ward Wide | Tree Replacement | In Development | To Be Confirmed | SfP 25/26 |
| St Ann's | Ward Wide | New Benches | In Development | To Be Confirmed | SfP 25/26 |
| St Ann's | Robin Hood Street | Resurface | Complete | 22/04/2025 | SfP 24/25 |
| St Ann's | Cardinal Close | Resurface | Complete | 13/12/2024 | SfP 24/25 |
| St Ann's | Teak Close | Resurface | Complete | 18/12/2024 | SfP 24/25 |
| St Ann's | Kilbourn Street | Resurface | Complete | 10/03/2025 | SfP 24/25 |
| St Ann's | Conway Close | Resurface | Complete | 10/03/2025 | SfP 24/25 |
| St Ann's | Sherwin Walk | Highway Improvements | Complete | 02/06/2025 | SfP 24/25 |
| St Ann's | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |
| St Ann's | Lotus Close | Micro Asphalt | Complete | 24/03/2025 | SfP 24/25 |
| St Anns | Palmerston Gardens | Resurfacing | Programmed | 17/11/2025 | EMCCA 25/26 |
| St. Anns | Carlton Road | Micro Asphalt | Complete | 02/04/2024 | LTP 24/25 |
| St. Anns | Lower Parliament Street | Resurface | Complete | 01/08/2024 | LTP 24/25 |
| Wollaton West | Russell Avenue | Retread | Complete | 28/03/2025 | LTP 25/26 |
| Wollaton West | Grangewood Road | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
| Wollaton West | Bramcote Lane | Resurfacing | In Development | To Be Confirmed | SfP 25/26 |
| Wollaton West | Smithson Drive | Micro Asphalt | Complete | 17/04/2024 | LTP 24/25 |
| Wollaton West | Dovecote Drive | Micro Asphalt | Complete | 17/04/2024 | LTP 24/25 |
| Wollaton West | Grangewood Road | Micro Asphalt | Complete | 25/03/2025 | LTP 24/25 |
| Wollaton West | Wollaton Road (Access Road) | Micro Asphalt | Complete | 15/04/2024 | LTP 24/25 |
| Wollaton West | Wollaton Road | Resurface | Complete | 12/05/2025 | SfP 24/25 |
| Wollaton West | Renfrew Drive | Retread | Complete | 03/04/2025 | SfP 24/25 |
| Wollaton West | Ward Wide | Bin Replacement | Complete | 01/08/2025 | SfP 24/25 |