List of schemes

WardRoadTypeInfoStart DateWork Stream
AspleyBeckley Road ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
AspleyColeby RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
AspleyDeepdene WayResurfaceComplete18/11/2024SfP 24/25
AspleyFenwick RoadResurfaceComplete20/01/2025SfP 24/25
AspleyLimetree AvenueResidents Parking Scheme Complete 15/06/2025SfP 24/25
AspleyMaltby CloseResurfaceComplete13/01/2025SfP 24/25
AspleyMaltby CloseResurfaceComplete13/01/2025SfP 24/25
AspleySherborne RoadResurfacingLive20/10/2025LTP 25/26
AspleyTiverton CloseFootway ResurfaceComplete13/01/2025SfP 24/25
AspleyWard wide Bin ReplacementComplete10/02/2025SfP 24/25
AspleyWard Wide Planned PatchingComplete01/02/2025SfP 24/25
AspleyWinsford CloseResurfaceComplete13/01/2025SfP 24/25
AspleyWithern RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
BasfordAlpine StreetMicro AsphaltComplete09/04/2024LTP 24/25
BasfordBarlock RoadRetreadComplete08/04/2025LTP 25/26
BasfordBowness AvenueMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordBroadhurst AvenueResurfaceComplete21/01/2025SfP 24/25
BasfordBulwell LaneResurfaceComplete06/07/2025SfP 24/25
BasfordGreenwich Avenue Parking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordHeatherly DriveResurfaceComplete10/02/2025SfP 24/25
BasfordLlanberis GroveResurfacingComplete25/07/2025LTP 25/26
BasfordMarlowe AvenueMicro AsphaltComplete07/06/2024LTP 24/25
BasfordMount PleasantMicro AsphaltComplete07/06/2024LTP 24/25
BasfordNewport DriveResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordPark Lane 2 New Bollards Complete15/01/2025SfP 24/25
BasfordPercy StreetMicro AsphaltComplete10/04/2024LTP 24/25
BasfordStockhill LaneMicro AsphaltComplete11/04/2024LTP 24/25
BasfordStoneycroft RoadResurfacingIn DevelopmentTo Be ConfirmedEMCCA 25/26
BasfordVernon RoadResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordWard Wide Parking RestrictionsOn site 30/09/2025SfP 24/25
BasfordWard Wide Bin ReplacementComplete17/02/2025SfP 24/25
BasfordWhitemoor RoadMicro AsphaltComplete08/04/2024LTP 24/25
Basford & SherwoodValley RoadMicro AsphaltComplete18/03/2025LTP 24/25
BerridgeArno AvenueMicro AsphaltComplete25/03/2025LTP 25/26
BerridgeEgypt RoadResurfaceComplete03/02/2025SfP 24/25
BerridgeExeter RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
BerridgeGladstone StreetMicro AsphaltComplete07/04/2024LTP 24/25
BerridgeHadbury RoadResurfaceComplete24/02/2025SfP 24/25
BerridgeLamcote StreetMicro AsphaltComplete03/04/2024LTP 24/25
BerridgeMaxwell CloseMicro AsphaltComplete05/04/2024LTP 24/25
BerridgeMyrtle AvenueMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgePelham AvenueResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgePremier RoadMicro AsphaltComplete07/04/2024LTP 24/25
BerridgeReigate RoadMicro AsphaltComplete19/08/2025EMCCA 25/26
BerridgeSecond AvenueMicro AsphaltComplete06/04/2024LTP 24/25
BerridgeSilverdale RoadMicro AsphaltComplete19/08/2025EMCCA 25/26
BerridgeSuez Street AreaDropped Crossing ImprovementsComplete 19/08/2025SfP 24/25
BerridgeWard WidePatchingIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgeWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgeWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgeWard Wide Parking RestrictionsOn site 01/08/2025SfP 24/25
BerridgeWimbledon Road AreaResident Parking Scheme and Parking RestrictionsComplete Autumn 2025SfP 24/25
BerridgeWiverton RoadMicro AsphaltComplete25/03/2025LTP 25/26
Berridge Charlesworth AvenueParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BestwoodB6004 Arnold RoadMicro AsphaltIn DevelopmentTo Be ConfirmedEMCCA 25/26
BestwoodBarent Close ResurfacingComplete28/07/2025SfP 25/26
BestwoodBeckhampton RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
BestwoodCottam Drive / Cottam GardensMicro AsphaltComplete17/03/2025SfP 24/25
BestwoodElmbridgeMicro AsphaltComplete26/03/2025SfP 24/25
BestwoodElsworth Drive Micro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BestwoodLytham GardensMicro AsphaltComplete17/04/2024LTP 24/25
BestwoodMildenhall CrescentResurfaceComplete17/02/2025SfP 24/25
BestwoodMorrell Bank ResurfacingComplete28/07/2025SfP 25/26
BestwoodMorrell Bank Estate Public Realm ImprovementsIn DevelopmentTo Be ConfirmedSfP 25/26
BestwoodPrendwick GardensResurfacingIn DevelopmentTo Be ConfirmedEMCCA 25/26
BestwoodSouthglade RoadResurfacingComplete28/07/2025LTP 25/26
BestwoodSouthglade Road ResurfaceComplete28/07/2025SfP 24/25
BestwoodWard Wide Planned PatchingComplete01/12/2024SfP 24/25
BestwoodWard Wide Bin ReplacementComplete24/02/2025SfP 24/25
Bestwood Ward WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughBracebridge DriveResurfacingComplete11/08/2025LTP 24/25
BilboroughBurnside RoadMicro AsphaltComplete24/03/2025SfP 24/25
BilboroughChingford RoadResurfaceComplete31/07/2025SfP 24/25
BilboroughCockington RoadMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughGlaisdale DrivePlanned Patching CompleteSummer 2025SfP 24/25
BilboroughGreystoke Drive AreaParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughHucknall RoadMicro AsphaltComplete04/08/2025LTP 24/25
BilboroughRosedale DriveMicro AsphaltComplete23/03/2025LTP 25/26
BilboroughStrelley RoadResurfaceComplete17/02/2025LTP 24/25
BilboroughStrelley RoadResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughWollaton ValeFootway ResurfaceComplete30/06/2025SfP 24/25
BilboroughWoodhouse WayResurfaceComplete06/05/2025SfP 24/25
BilboroughWoodhouse WayResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
BulwellArmstrong RoadMicro AsphaltComplete22/03/2025SfP 24/25
BulwellBardney DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellBarry StreetMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellHazel StreetMicro AsphaltComplete30/08/2025EMCCA 25/26
BulwellHighbury RoadFootway ResurfaceIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellLime Street / Muriel StreetResurfaceComplete29/11/2024SfP 24/25
BulwellMerchant StreetMicro AsphaltComplete30/08/2025EMCCA 25/26
BulwellMinerva StreetMicro AsphaltComplete30/08/2025EMCCA 25/26
BulwellMoorbridge Cottages Parking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellSellerswood DriveResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellSquires AvenueResurfaceComplete07/04/2025SfP 24/25
BulwellSquires AvenueResurfaceComplete02/04/2025SfP 24/25
BulwellWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellWard wide Planned PatchingComplete01/12/2024SfP 24/25
Bulwell ForestBelmont Avenue Retread Complete26/03/2025SfP 24/25
Bulwell ForestBestwood Park Drive WestResurfacingIn DevelopmentTo Be ConfirmedEMCCA 25/26
Bulwell ForestBestwood Road Retread Complete27/03/2025SfP 24/25
Bulwell ForestBestwood Road RetreadIn DevelopmentTo Be ConfirmedSfP 25/26
Bulwell ForestBrora RoadMicro AsphaltComplete16/04/2024LTP 24/25
Bulwell ForestFlaxton Way ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
Bulwell ForestPiccadillyPlanned PatchingComplete01/02/2025SfP 24/25
Bulwell ForestRevelstoke Way PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
Bulwell ForestRidgewayResurfaceComplete03/03/2025SfP 24/25
Bulwell ForestShakespeare StreetResurfacingComplete11/08/2025LTP 24/25
Bulwell ForestSt Albans Road ResurfaceComplete25/08/2025SfP 24/25
Bulwell ForestTorkard Drive/Old Farm RoadDropped Crossing ImprovementsComplete 18/08/2025SfP 24/25
Bulwell ForestWard Wide Planned PatchingOn site Summer 2025SfP 24/25
CastleClumber StreetResurfacingComplete04/08/2025LTP 24/25
CastleHounds Gate Footway ResurfaceIn DevelopmentTo Be ConfirmedSfP 25/26
CastleNuthall RoadResurfacingComplete07/07/2025LTP 24/25
CastleOld Lenton StreetJunction RealignmentComplete15/09/2025SfP 24/25
CastlePlumptre StreetResurfaceComplete10/03/2025SfP 24/25
CastleSt James's TerraceResurfaceComplete15/03/2025SfP 24/25
CastleWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
CastleWard WideDropped CrossingsIn DevelopmentTo Be ConfirmedSfP 25/26
CastleWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
CastleWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
CastleWard Wide New Trees/Urban Greening Complete Summer 2025SfP 24/25
Clifton EastBlaise CloseMicro AsphaltComplete11/08/2025EMCCA 25/26
Clifton EastCaister RoadMicro AsphaltComplete11/08/2025EMCCA 25/26
Clifton EastCerne CloseMicro AsphaltComplete11/08/2025EMCCA 25/26
Clifton EastClifton LaneResurfaceComplete14/07/2025SfP 24/25
Clifton EastDungannon RoadResurfaceComplete30/07/2025SfP 24/25
Clifton EastFailsworth CloseMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastFarnborough RoadRaised Plateau ResurfacingComplete23/06/2025SfP 24/25
Clifton EastGardendale AvenueResidents Parking SchemeIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastGreencroft AreaResidents Parking SchemeComplete Summer 2025SfP 24/25
Clifton EastMiddlefell WaySlurry SealComplete18/03/2025SfP 24/25
Clifton EastOldoak RoadResurfaceComplete22/11/2024SfP 24/25
Clifton EastWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastWard wide Bin ReplacementComplete01/08/2025SfP 24/25
Clifton EastWoodkirk RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
Clifton EastWoodkirk RoadMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastWrenthorpe ValeMicro AsphaltComplete12/08/2025EMCCA 25/26
Clifton WestRuddington LaneMicro AsphaltComplete21/04/2024LTP 24/25
Clifton WestAaron CloseMicro AsphaltComplete12/08/2025EMCCA 25/26
Clifton WestBader RoadMicro AsphaltComplete13/08/2025EMCCA 25/26
Clifton WestBrookthorpe WayMicro AsphaltComplete19/03/2025SfP 24/25
Clifton WestCribb CloseMicro AsphaltComplete13/08/2025EMCCA 25/26
Clifton WestHannah CrescentMicro AsphaltComplete13/08/2025EMCCA 25/26
Clifton WestHolgateRetreadComplete26/03/2025SfP 24/25
Clifton WestNobel Road, Hartness Road, Fabis Drive, Clifton Village, Lark Hill (New Rise)Speed RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton WestPieris DriveMicro AsphaltComplete18/03/2025SfP 24/25
Clifton WestVillage RoadRetreadComplete26/03/2025LTP 24/25
Clifton WestWilford Cross Roads Junction ImprovementsIn DevelopmentTo Be ConfirmedSfP 25/26
DalesAvon RoadResurfacingComplete23/07/2025EMCCA 25/26
DalesBewick DriveMicro AsphaltComplete18/08/2025EMCCA 25/26
DalesBewick Drive AreaDropped Crossing ImprovementsComplete07/08/2025SfP 24/25
DalesCardale RoadResurfaceComplete19/08/2024LTP 24/25
DalesColwick Road side roads/Meadow GroveParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
DalesDaleside RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
DalesDaleview RoadRetreadComplete31/03/2025SfP 24/25
DalesDragon Sculpture New BenchesIn DevelopmentTo Be ConfirmedSfP 25/26
DalesHereford RoadRetreadComplete24/03/2025SfP 24/25
DalesHereford RoadResurfaceComplete23/07/2025SfP 24/25
DalesHereford Road Footway ResurfaceIn DevelopmentTo Be ConfirmedSfP 25/26
DalesNewark Crescent Dropped CrossingsIn DevelopmentTo Be ConfirmedSfP 25/26
DalesWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
DalesWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Dales Lord Nelson Street ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
HGAA610 Bobbers Mill Bridge Road Safety Improvements In DevelopmentAutumn 2025SfP 24/25
HGABentinck RoadResurfaceComplete07/10/2024LTP 24/25
HGABerridge Road CentralResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
HGAColville StreetResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
HGADarley Road and Darley Avenue Micro AsphaltComplete17/03/2025SfP 24/25
HGADundas CloseResurfacingIn DevelopmentTo Be ConfirmedEMCCA 25/26
HGAGill Street Dropped Crossing ImprovementsComplete11/08/2025SfP 24/25
HGAHampden StreetResurfacingIn DevelopmentTo Be ConfirmedEMCCA 25/26
HGAIreton StreetMicro AsphaltComplete06/04/2024LTP 24/25
HGAKnighton AvenueMicro AsphaltComplete25/03/2025SfP 24/25
HGANewstead GroveResurfaceComplete27/01/2025SfP 24/25
HGAWard Wide Planned Patching Complete12/12/2024SfP 24/25
HGAWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
LAWEOrston Drive ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEScalford DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWard Wide PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWemyss GardensResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyAberford Avenue Micro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyAspley LaneMicro AsphaltComplete18/04/2024LTP 24/25
Leen ValleyBeechdale RoadHFSComplete01/11/2024LTP 24/25
Leen ValleyBexleigh GardensMicro AsphaltComplete25/03/2025LTP 25/26
Leen ValleyCherry Wood Drive / Spean DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyDalemoor Gardens / Ascot Road / Glencairn DriveParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyHolbeck RoadResurfaceComplete01/11/2024LTP 24/25
Leen ValleyOakwood DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyTrentham DriveResurfaceComplete20/03/2025SfP 24/25
Leen ValleyWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
Leen ValleyWard Wide Planned Patching Complete01/12/2024SfP 24/25
Leen ValleyWestern BoulevardResurfacingComplete07/07/2025LTP 24/25
Leen ValleyWilford Crescent EastResurfacingComplete15/09/2025LTP 24/25
Leen ValleyWilkinson StreetResurfaceComplete23/09/2024LTP 24/25
LWEBroughton Drive/Austrey AvenueParking Restrictions CompleteSummer 2025SfP 24/25
LWEGregory StreetMicro AsphaltComplete20/04/2024LTP 24/25
LWEHawton CrescentResurfaceComplete07/04/2025SfP 24/25
LWELenton LaneMicro AsphaltComplete02/04/2024LTP 24/25
LWENewland CloseResurfaceComplete14/03/2025SfP 24/25
LWEScalford DriveMicro AsphaltComplete21/03/2025SfP 24/25
LWESelston DriveRetreadComplete26/03/2025LTP 25/26
LWETrinity Avenue / Church Avenue / Albert Road / Lois AvenueMicro AsphaltComplete22/03/2025SfP 24/25
MapperleyBoynton RoadMicro AsphaltComplete23/03/2025SfP 24/25
MapperleyBrewsters Road ResurfaceComplete24/02/2025SfP 24/25
MapperleyDagmar GroveMicro AsphaltComplete04/04/2024LTP 24/25
MapperleyEaton StreetMicro AsphaltComplete23/03/2025SfP 24/25
MapperleyMapperley Hall DriveRetreadComplete01/04/2025LTP 25/26
MapperleyMapperley RiseMicro AsphaltComplete03/04/2024LTP 24/25
MapperleyMapperley RoadMicro AsphaltComplete04/04/2024LTP 24/25
MapperleySpringwood GardensRetreadComplete25/03/2025LTP 24/25
MapperleySt Jude's AvenueResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleyTavistock DriveParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleyWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleyWard Wide PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleyWoodlane GardensMicro AsphaltComplete23/03/2025SfP 24/25
MeadowsArleston DriveResurfacingComplete14/07/2025LTP 24/25
MeadowsBathley StreetResurfaceComplete11/03/2025SfP 24/25
MeadowsBathley StreetSlurry SealComplete04/03/2025SfP 24/25
MeadowsBeardsley GardensMicro AsphaltComplete18/08/2025EMCCA 25/26
MeadowsBunbury StreetMicro AsphaltComplete21/03/2025SfP 24/25
MeadowsBurge CloseMicro AsphaltComplete21/03/2025SfP 24/25
MeadowsColliery Close Surfacing and Drainage Improvements Complete02/06/2025SfP 24/25
MeadowsHobart CloseMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsKelso GardensMicro AsphaltComplete18/08/2025EMCCA 25/26
MeadowsQuayside Close/ Meadows Close and Beauvale Road Residents Parking SchemeIn DevelopmentAutumn 2025SfP 24/25
MeadowsQueens DriveResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
MeadowsQueens Drive (Phase 1)ResurfaceComplete09/09/2024LTP 24/25
MeadowsQueens Drive (Phase 2)ResurfaceComplete04/11/2024LTP 24/25
MeadowsQueen's Road New Pedestrian Crossing Complete 28/07/2025SfP 24/25
MeadowsRobin Hood WayFootpath Improvements In DevelopmentTo Be ConfirmedSfP 24/25
MeadowsRobin Hood WayRoad Safety ImprovementsIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsSaffron GardensMicro AsphaltComplete14/08/2025EMCCA 25/26
MeadowsSt Georges DriveMicro AsphaltComplete18/08/2025EMCCA 25/26
MeadowsWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Radford174 Derby Road / St Peters Street / Lonsdale Road / Hartley RoadParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordArgyle StreetMicro AsphaltComplete24/03/2025SfP 24/25
RadfordBalfour RoadResurfaceComplete10/03/2025SfP 24/25
RadfordBastion StreetResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
RadfordBovill StreetMicro AsphaltComplete26/03/2025LTP 25/26
RadfordBright StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordDenman Street West ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordDorking RoadMicro AsphaltComplete25/03/2025LTP 25/26
RadfordDouglas RoadResurfaceComplete24/03/2025SfP 24/25
RadfordFaraday RoadMicro AsphaltComplete10/04/2024LTP 24/25
RadfordGarden StreetMicro AsphaltComplete07/04/2024LTP 24/25
RadfordGraham StreetMicro AsphaltComplete08/04/2025EMCCA 25/26
RadfordMiall StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordMiddleton StreetMicro AsphaltComplete09/04/2024LTP 24/25
RadfordNorton StreetMicro AsphaltComplete22/03/2025SfP 24/25
RadfordSalisbury SquareMicro AsphaltComplete09/04/2024LTP 24/25
RadfordSalisbury StreetMicro AsphaltComplete09/04/2024LTP 24/25
RadfordSt Peters Street Urban GreeningIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
RadfordWellington SquareMicro AsphaltComplete06/04/2024LTP 24/25
SherwoodA6514 Valley RoadMicro AsphaltComplete26/08/2025EMCCA 25/26
SherwoodAmpthill RiseMicro AsphaltComplete19/08/2025EMCCA 25/26
SherwoodDevonshire Road ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
SherwoodHaydn Road Shops Cycle ParkingIn DevelopmentTo Be ConfirmedSfP 25/26
SherwoodLongdale DriveResurfaceComplete12/08/2024LTP 24/25
SherwoodLoscoe Road CyclewayComplete01/04/2025SfP 24/25
SherwoodMansfield Rd Area Residents Parking and Car Parks Scheme In DevelopmentSpring 2026SfP 24/25
SherwoodPerry RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
SherwoodPerry Road Planned Patching Complete31/01/2025SfP 24/25
SherwoodRaven AvenueMicro AsphaltComplete19/08/2025EMCCA 25/26
SherwoodWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
SherwoodWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
SherwoodWhatton Rise / Bradmore RiseResurfaceComplete06/01/2025SfP 24/25
SherwoodWinchester Street CyclewayComplete18/06/2025SfP 24/25
St AnnsPalmerston GardensResurfacingIn DevelopmentTo Be ConfirmedEMCCA 25/26
St Ann'sCardinal CloseResurfaceComplete13/12/2024SfP 24/25
St Ann'sConway Close ResurfaceComplete10/03/2025SfP 24/25
St Ann'sKilbourn StreetResurfaceComplete10/03/2025SfP 24/25
St Ann'sLinnell Street ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sLotus CloseMicro AsphaltComplete24/03/2025SfP 24/25
St Ann'sRobin Hood StreetResurfaceComplete22/04/2025SfP 24/25
St Ann'sSerlby Rise PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sSherwin Walk Highway ImprovementsComplete02/06/2025SfP 24/25
St Ann'sTeak CloseResurfaceComplete18/12/2024SfP 24/25
St Ann'sWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
St Ann'sWard Wide Parking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard Wide New BenchesIn DevelopmentTo Be ConfirmedSfP 25/26
St. AnnsCarlton RoadMicro AsphaltComplete02/04/2024LTP 24/25
St. AnnsLower Parliament StreetResurfaceComplete01/08/2024LTP 24/25
Wollaton WestBramcote Lane ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
Wollaton WestDovecote DriveMicro AsphaltComplete17/04/2024LTP 24/25
Wollaton WestGrangewood RoadMicro AsphaltComplete25/03/2025LTP 24/25
Wollaton WestGrangewood RoadMicro AsphaltComplete25/03/2025LTP 25/26
Wollaton WestRenfrew DriveRetreadComplete03/04/2025SfP 24/25
Wollaton WestRussell AvenueRetreadComplete28/03/2025LTP 25/26
Wollaton WestSmithson DriveMicro AsphaltComplete17/04/2024LTP 24/25
Wollaton WestWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
Wollaton WestWollaton Road ResurfaceComplete12/05/2025SfP 24/25
Wollaton WestWollaton Road (Access Road)Micro AsphaltComplete15/04/2024LTP 24/25