List of schemes
Ward | Road | Type | Info | Start Date | Work Stream |
---|---|---|---|---|---|
Aspley | Coleby Road | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
Aspley | Deepdene Way | Resurface | Complete | 18/11/2024 | SfP 24/25 |
Aspley | Fenwick Road | Resurface | Complete | 20/01/2025 | SfP 24/25 |
Aspley | Limetree Avenue | Residents Parking Scheme | Programmed | 15/06/2025 | SfP 24/25 |
Aspley | Maltby Close | Resurface | Complete | 13/01/2025 | SfP 24/25 |
Aspley | Sherborne Road | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
Aspley | Tiverton Close | Footway Resurface | Complete | 13/01/2025 | SfP 24/25 |
Aspley | Ward wide | Bin Replacement | Complete | 10/02/2025 | SfP 24/25 |
Aspley | Ward Wide | Planned Patching | Complete | 01/02/2025 | SfP 24/25 |
Aspley | Winsford Close | Resurface | Complete | 13/01/2025 | SfP 24/25 |
Aspley | Withern Road | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
Basford | Alpine Street | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
Basford | Barlock Road | Retread | Complete | 08/04/2025 | LTP 25/26 |
Basford | Broadhurst Avenue | Resurface | Complete | 21/01/2025 | SfP 24/25 |
Basford | Bulwell Lane | Resurface | Programmed | 06/07/2025 | SfP 24/25 |
Basford | Heatherly Drive | Resurface | Complete | 10/02/2025 | SfP 24/25 |
Basford | Llanberis Grove | Reconstruction | Programmed | 25/07/2025 | LTP 25/26 |
Basford | Marlowe Avenue | Micro Asphalt | Complete | 07/06/2024 | LTP 24/25 |
Basford | Mount Pleasant | Micro Asphalt | Complete | 07/06/2024 | LTP 24/25 |
Basford | Park Lane | 2 New Bollards | Complete | 15/01/2025 | SfP 24/25 |
Basford | Percy Street | Micro Asphalt | Complete | 10/04/2024 | LTP 24/25 |
Basford | Stockhill Lane | Micro Asphalt | Complete | 11/04/2024 | LTP 24/25 |
Basford | Ward Wide | Parking Restrictions | In Development | Summer 2025 | SfP 24/25 |
Basford | Ward Wide | Bin Replacement | Complete | 17/02/2025 | SfP 24/25 |
Basford | Whitemoor Road | Micro Asphalt | Complete | 08/04/2024 | LTP 24/25 |
Basford & Sherwood | Valley Road | Micro Asphalt | Complete | 18/03/2025 | LTP 24/25 |
Berridge | Arno Avenue | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
Berridge | Egypt Road | Resurface | Complete | 03/02/2025 | SfP 24/25 |
Berridge | Exeter Road | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
Berridge | Gladstone Street | Micro Asphalt | Complete | 07/04/2024 | LTP 24/25 |
Berridge | Hadbury Road | Resurface | Complete | 24/02/2025 | SfP 24/25 |
Berridge | Lamcote Street | Micro Asphalt | Complete | 03/04/2024 | LTP 24/25 |
Berridge | Maxwell Close | Micro Asphalt | Complete | 05/04/2024 | LTP 24/25 |
Berridge | Premier Road | Micro Asphalt | Complete | 07/04/2024 | LTP 24/25 |
Berridge | Reigate Road | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Berridge | Second Avenue | Micro Asphalt | Complete | 06/04/2024 | LTP 24/25 |
Berridge | Silverdale Road | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Berridge | Suez Street Area | Dropped Crossing Improvements | In Development | Summer 2025 | SfP 24/25 |
Berridge | Ward Wide | Parking Restrictions | In Development | Summer 2025 | SfP 24/25 |
Berridge | Wimbledon Road Area | Resident Parking Scheme and Parking Restrictions | In Development | Summer 2025 | SfP 24/25 |
Berridge | Wiverton Road | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
Bestwood | B6004 Arnold Road | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Bestwood | Beckhampton Road | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
Bestwood | Cottam Drive / Cottam Gardens | Micro Asphalt | Complete | 17/03/2025 | SfP 24/25 |
Bestwood | Elmbridge | Micro Asphalt | Complete | 26/03/2025 | SfP 24/25 |
Bestwood | Lytham Gardens | Micro Asphalt | Complete | 17/04/2024 | LTP 24/25 |
Bestwood | Mildenhall Crescent | Resurface | Complete | 17/02/2025 | SfP 24/25 |
Bestwood | Southglade Road (Phase 2) | Reconstruction | Programmed | 28/07/2025 | LTP 25/26 |
Bestwood | Southglade Road (Phase 1) | Resurface | Programmed | 28/07/2025 | SfP 24/25 |
Bestwood | Ward Wide | Planned Patching | Complete | 01/12/2024 | SfP 24/25 |
Bestwood | Ward Wide | Bin Replacement | Complete | 24/02/2025 | SfP 24/25 |
Bilborough | Bracebridge Drive | Resurfacing | Programmed | 11/08/2025 | LTP 24/25 |
Bilborough | Burnside Road | Micro Asphalt | Complete | 24/03/2025 | SfP 24/25 |
Bilborough | Chingford Road | Resurface | Programmed | 28/07/2025 | SfP 24/25 |
Bilborough | Glaisdale Drive | Planned Patching | On site | Summer 2025 | SfP 24/25 |
Bilborough | Hucknall Road | Micro Asphalt | Programmed | 04/08/2025 | LTP 24/25 |
Bilborough | Rosedale Drive | Micro Asphalt | Complete | 23/03/2025 | LTP 25/26 |
Bilborough | Strelley Road | Resurface | Complete | 17/02/2025 | LTP 24/25 |
Bilborough | Wollaton Vale | Footway Resurface | Programmed | 04/08/2025 | SfP 24/25 |
Bilborough | Woodhouse Way | Resurface | Complete | 06/05/2025 | SfP 24/25 |
Bilborough | Woodhouse Way | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
Bulwell | Armstrong Road | Micro Asphalt | Complete | 22/03/2025 | SfP 24/25 |
Bulwell | Hazel Street | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Bulwell | Lime Street / Muriel Street | Resurface | Complete | 29/11/2024 | SfP 24/25 |
Bulwell | Merchant Street | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Bulwell | Minerva Street | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Bulwell | Squires Avenue | Resurface | Complete | 07/04/2025 | SfP 24/25 |
Bulwell | Squires Avenue | Resurface | Complete | 02/04/2025 | SfP 24/25 |
Bulwell | Ward wide | Planned Patching | Complete | 01/12/2024 | SfP 24/25 |
Bulwell Forest | Belmont Avenue | Retread | Complete | 26/03/2025 | SfP 24/25 |
Bulwell Forest | Bestwood Road | Retread | Complete | 27/03/2025 | SfP 24/25 |
Bulwell Forest | Brora Road | Micro Asphalt | Complete | 16/04/2024 | LTP 24/25 |
Bulwell Forest | Piccadilly | Planned Patching | Complete | 01/02/2025 | SfP 24/25 |
Bulwell Forest | Ridgeway | Resurface | Complete | 03/03/2025 | SfP 24/25 |
Bulwell Forest | Shakespeare Street | Reconstruction | Programmed | 04/08/2025 | LTP 24/25 |
Bulwell Forest | St Albans Road | Resurface | Programmed | 28/07/2025 | SfP 24/25 |
Bulwell Forest | Torkard Drive/Old Farm Road | Dropped Crossing Improvements | In Development | Summer 2025 | SfP 24/25 |
Bulwell Forest | Ward Wide | Planned Patching | In Development | Summer 2025 | SfP 24/25 |
Castle | Clumber Street | Resurfacing | Programmed | 04/08/2025 | LTP 24/25 |
Castle | Nuthall Road | Resurfacing | Programmed | 07/07/2025 | LTP 24/25 |
Castle | Old Lenton Street | Junction Realignment | In Development | Summer 2025 | SfP 24/25 |
Castle | Plumptre Street | Resurface | Complete | 10/03/2025 | SfP 24/25 |
Castle | St James's Terrace | Resurface | Complete | 15/03/2025 | SfP 24/25 |
Castle | Ward Wide | Bin Replacement | Complete | Summer 2025 | SfP 24/25 |
Castle | Ward Wide | New Trees/Urban Greening | Part Complete | Summer 2025 | SfP 24/25 |
Clifton East | Blaise Close | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton East | Caister Road | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton East | Cerne Close | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton East | Clifton Lane | Resurface | Programmed | 21/07/2025 | SfP 24/25 |
Clifton East | Dungannon Road | Resurface | Complete | 07/04/2025 | SfP 24/25 |
Clifton East | Farnborough Road | Raised Plateau Resurfacing | Programmed | 23/06/2025 | SfP 24/25 |
Clifton East | Greencroft Area | Residents Parking Scheme | In Development | Summer 2025 | SfP 24/25 |
Clifton East | Middlefell Way | Slurry Seal | Complete | 18/03/2025 | SfP 24/25 |
Clifton East | Oldoak Road | Resurface | Complete | 22/11/2024 | SfP 24/25 |
Clifton East | Ward wide | Bin Replacement | Part Complete | Summer 2025 | SfP 24/25 |
Clifton East | Woodkirk Road | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
Clifton East | Wrenthorpe Vale | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton North | Ruddington Lane | Micro Asphalt | Complete | 21/04/2024 | LTP 24/25 |
Clifton West | Aaron Close | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton West | Bader Road | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton West | Brookthorpe Way | Micro Asphalt | Complete | 19/03/2025 | SfP 24/25 |
Clifton West | Cribb Close | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton West | Hannah Crescent | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Clifton West | Holgate | Retread | Complete | 26/03/2025 | SfP 24/25 |
Clifton West | Pieris Drive | Micro Asphalt | Complete | 18/03/2025 | SfP 24/25 |
Clifton West | Village Road | Retread | Complete | 26/03/2025 | LTP 24/25 |
Dales | Avon Road | Reconstruction | In Development | To Be Confirmed | EMCCA 25/26 |
Dales | Bewick Drive | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Dales | Bewick Drive Area | Dropped Crossing Improvements | In Development | Summer 2025 | SfP 24/25 |
Dales | Cardale Road | Resurface | Complete | 19/08/2024 | LTP 24/25 |
Dales | Daleside Road | Micro Asphalt | In Development | To Be Confirmed | LTP 25/26 |
Dales | Daleview Road | Retread | Complete | 31/03/2025 | SfP 24/25 |
Dales | Hereford Road | Retread | Complete | 24/03/2025 | SfP 24/25 |
Dales | Hereford Road | Resurface | Programmed | 24/07/2025 | SfP 24/25 |
HGA | A610 Bobbers Mill Bridge | Road Safety Improvements | In Development | Summer 2025 | SfP 24/25 |
HGA | Bentinck Road | Resurface | Complete | 07/10/2024 | LTP 24/25 |
HGA | Colville Street | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
HGA | Darley Road and Darley Avenue | Micro Asphalt | Complete | 17/03/2025 | SfP 24/25 |
HGA | Dundas Close | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
HGA | Gill Street and Hampden Street | Dropped Crossing Improvements | In Development | Summer 2025 | SfP 24/25 |
HGA | Hampden Street | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
HGA | Ireton Street | Micro Asphalt | Complete | 06/04/2024 | LTP 24/25 |
HGA | Knighton Avenue | Micro Asphalt | Complete | 25/03/2025 | SfP 24/25 |
HGA | Newstead Grove | Resurface | Complete | 27/01/2025 | SfP 24/25 |
HGA | Ward Wide | Planned Patching | Complete | 12/12/2024 | SfP 24/25 |
HGA | Ward Wide | Bin Replacement | In Development | Summer 2025 | SfP 24/25 |
Leen Valley | Aspley Lane | Micro Asphalt | Complete | 18/04/2024 | LTP 24/25 |
Leen Valley | Beechdale Road | HFS | Complete | 01/11/2024 | LTP 24/25 |
Leen Valley | Bexleigh Gardens | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
Leen Valley | Holbeck Road | Resurface | Complete | 01/11/2024 | LTP 24/25 |
Leen Valley | Trentham Drive | Resurface | Complete | 20/03/2025 | SfP 24/25 |
Leen Valley | Ward Wide | Bin Replacement | In Development | Summer 2025 | SfP 24/25 |
Leen Valley | Ward Wide | Planned Patching | Complete | 01/12/2024 | SfP 24/25 |
Leen Valley | Western Boulevard | Resurfacing | Programmed | 07/07/2025 | LTP 24/25 |
Leen Valley | Wilford Crescent East | Resurfacing | In Development | To Be Confirmed | LTP 24/25 |
Leen Valley | Wilkinson Street | Resurface | Complete | 23/09/2024 | LTP 24/25 |
LWE | Broughton Drive/Austrey Avenue | Parking Restrictions | In Development | Summer 2025 | SfP 24/25 |
LWE | Gregory Street | Micro Asphalt | Complete | 20/04/2024 | LTP 24/25 |
LWE | Hawton Crescent | Resurface | Complete | 07/04/2025 | SfP 24/25 |
LWE | Lenton Lane | Micro Asphalt | Complete | 02/04/2024 | LTP 24/25 |
LWE | Newland Close | Resurface | Complete | 14/03/2025 | SfP 24/25 |
LWE | Scalford Drive | Micro Asphalt | Complete | 21/03/2025 | SfP 24/25 |
LWE | Selston Drive | Retread | Complete | 26/03/2025 | LTP 25/26 |
LWE | Trinity Avenue / Church Avenue / Albert Road / Lois Avenue | Micro Asphalt | Complete | 22/03/2025 | SfP 24/25 |
Mapperley | Boynton Road | Micro Asphalt | Complete | 23/03/2025 | SfP 24/25 |
Mapperley | Brewsters Road | Resurface | Complete | 24/02/2025 | SfP 24/25 |
Mapperley | Dagmar Grove | Micro Asphalt | Complete | 04/04/2024 | LTP 24/25 |
Mapperley | Eaton Street | Micro Asphalt | Complete | 23/03/2025 | SfP 24/25 |
Mapperley | Mapperley Hall Drive | Retread | Complete | 01/04/2025 | LTP 25/26 |
Mapperley | Mapperley Rise | Micro Asphalt | Complete | 03/04/2024 | LTP 24/25 |
Mapperley | Mapperley Road | Micro Asphalt | Complete | 04/04/2024 | LTP 24/25 |
Mapperley | Springwood Gardens | Retread | Complete | 25/03/2025 | LTP 24/25 |
Mapperley | Woodlane Gardens | Micro Asphalt | Complete | 23/03/2025 | SfP 24/25 |
Meadows | Arleston Drive | Resurfacing | Programmed | 11/08/2025 | LTP 24/25 |
Meadows | Bathley Street | Resurface | Complete | 11/03/2025 | SfP 24/25 |
Meadows | Bathley Street | Slurry Seal | Complete | 04/03/2025 | SfP 24/25 |
Meadows | Beardsley Gardens | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Meadows | Bunbury Street | Micro Asphalt | Complete | 21/03/2025 | SfP 24/25 |
Meadows | Burge Close | Micro Asphalt | Complete | 21/03/2025 | SfP 24/25 |
Meadows | Colliery Close | Surfacing and Drainage Improvements | Live | 02/06/2025 | SfP 24/25 |
Meadows | Kelso Gardens | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Meadows | Quayside Close/ Meadows Close and Beauvale Road | Residents Parking Scheme | In Development | Summer 2025 | SfP 24/25 |
Meadows | Queens Drive (Phase 3) | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
Meadows | Queens Drive (Phase 1) | Resurface | Complete | 09/09/2024 | LTP 24/25 |
Meadows | Queens Drive (Phase 2) | Resurface | Complete | 04/11/2024 | LTP 24/25 |
Meadows | Queen's Road | New Pedestrian Crossing | Programmed | 28/07/2025 | SfP 24/25 |
Meadows | Robin Hood Way | Footpath Improvements | In Development | To Be Confirmed | SfP 24/25 |
Meadows | Saffron Gardens | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Meadows | St Georges Drive | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Radford | Argyle Street | Micro Asphalt | Complete | 24/03/2025 | SfP 24/25 |
Radford | Balfour Road | Resurface | Complete | 10/03/2025 | SfP 24/25 |
Radford | Bastion Street | Resurfacing | In Development | To Be Confirmed | LTP 25/26 |
Radford | Bovill Street | Micro Asphalt | Complete | 26/03/2025 | LTP 25/26 |
Radford | Bright Street | Micro Asphalt | Complete | 08/04/2024 | LTP 24/25 |
Radford | Dorking Road | Micro Asphalt | Complete | 25/03/2025 | LTP 25/26 |
Radford | Douglas Road | Resurface | Complete | 24/03/2025 | SfP 24/25 |
Radford | Faraday Road | Micro Asphalt | Complete | 10/04/2024 | LTP 24/25 |
Radford | Garden Street | Micro Asphalt | Complete | 07/04/2024 | LTP 24/25 |
Radford | Graham Street | Micro Asphalt | Complete | 08/04/2024 | EMCCA 25/26 |
Radford | Miall Street | Micro Asphalt | Complete | 08/04/2024 | LTP 24/25 |
Radford | Middleton Street | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
Radford | Norton Street | Micro Asphalt | Complete | 22/03/2025 | SfP 24/25 |
Radford | Salisbury Square | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
Radford | Salisbury Street | Micro Asphalt | Complete | 09/04/2024 | LTP 24/25 |
Radford | Ward Wide | Bin Replacement | In Development | Summer 2025 | SfP 24/25 |
Radford | Wellington Square | Micro Asphalt | Complete | 06/04/2024 | LTP 24/25 |
Sherwood | A6514 Valley Road | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Sherwood | Ampthill Rise | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Sherwood | Longdale Drive | Resurface | Complete | 12/08/2024 | LTP 24/25 |
Sherwood | Loscoe Road | Cycleway | Complete | 01/04/2025 | SfP 24/25 |
Sherwood | Mansfield Rd Area | Residents Parking and Car Parks Scheme | In Development | Summer 2025 | SfP 24/25 |
Sherwood | Perry Road | Reconstruction | In Development | To Be Confirmed | LTP 25/26 |
Sherwood | Perry Road | Planned Patching | On site | 31/01/2025 | SfP 24/25 |
Sherwood | Raven Avenue | Micro Asphalt | In Development | To Be Confirmed | EMCCA 25/26 |
Sherwood | Ward Wide | Bin Replacement | In Development | Summer 2025 | SfP 24/25 |
Sherwood | Whatton Rise / Bradmore Rise | Resurface | Complete | 06/01/2025 | SfP 24/25 |
Sherwood | Winchester Street | Cycleway | Part Complete | Summer 2025 | SfP 24/25 |
St Ann's | Cardinal Close | Resurface | Complete | 13/12/2024 | SfP 24/25 |
St Ann's | Conway Close | Resurface | Complete | 10/03/2025 | SfP 24/25 |
St Ann's | Kilbourn Street | Resurface | Complete | 10/03/2025 | SfP 24/25 |
St Ann's | Lotus Close | Micro Asphalt | Complete | 24/03/2025 | SfP 24/25 |
St Ann's | Robin Hood Street | Resurface | Complete | 22/04/2025 | SfP 24/25 |
St Ann's | Sherwin Walk | Highway Improvements | Live | 02/06/2025 | SfP 24/25 |
St Ann's | Teak Close | Resurface | Complete | 18/12/2024 | SfP 24/25 |
St Ann's | Ward Wide | Bin Replacement | In Development | Summer 2025 | SfP 24/25 |
St. Anns | Carlton Road | Micro Asphalt | Complete | 02/04/2024 | LTP 24/25 |
St. Anns | Lower Parliament Street | Resurface | Complete | 01/08/2024 | LTP 24/25 |
Wollaton West | Dovecote Drive | Micro Asphalt | Complete | 17/04/2024 | LTP 24/25 |
Wollaton West | Grangewood Road | Micro Asphalt | Complete | 25/03/2025 | LTP 24/25 |
Wollaton West | Grangewood Road | Micro Asphalt | In Development | To Be Confirmed | LTP 25/26 |
Wollaton West | Renfrew Drive | Retread | Complete | 03/04/2025 | SfP 24/25 |
Wollaton West | Russell Avenue | Retread | Complete | 28/03/2025 | LTP 25/26 |
Wollaton West | Smithson Drive | Micro Asphalt | Complete | 17/04/2024 | LTP 24/25 |
Wollaton West | Ward Wide | Bin Replacement | In Development | Summer 2025 | SfP 24/25 |
Wollaton West | Wollaton Road | Resurface | Complete | 12/05/2025 | SfP 24/25 |
Wollaton West | Wollaton Road (Access Road) | Micro Asphalt | Complete | 15/04/2024 | LTP 24/25 |