Feedback Survey

If we have finished work in your area, then we would love to know your feedback.

Click here to fill in the survey.

Streets for People works

Nottingham City Council has approved £11million of improvements to make our neighbourhoods greener, safer, better places to get around.

In 2021, the council successfully bid as part of a competitive process for £18 million from the Government’s Levelling Up fund to improve streets and local town centres, and make walking and cycling easier and safer.

The money will be used to make some exciting changes in the next two years, with the biggest chunk of money going to the Streets for People programme.

The funding will be split between each ward, with areas most in need getting more funding. The works have been identified by local people and prioritised by ward councillors, and are due to be completed by March 2024.

Our transport teams will be:

  • Upgrading pavements and walkways to make them safer, especially taking into consideration the needs of older people and those with less mobility
  • Repairs to roads and cycle paths to help us improve traffic flow and safety, across all twenty wards

Below is the planned programme of works.

  • Check this page for the latest updates, including work delays due to weather or other issues
  • To search for your street, press ‘CTRL F’ on your keyboard and enter your street name. If your street name isn’t found, there are no works currently planned

Programme of works

Ward Road Details Type Info Start Date
Aspley Bin Replacement Clean and Green Clean and Green Complete 14/08/2023
Aspley Lindbridge Road Resurface Carriageway Complete 09/02/2023
Aspley School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Aspley Tree Works Clean and Green Clean and Green Complete 01/08/2023
Aspley Lindfield Road Resurface Carriageway Complete 20/03/2023
Aspley Broxtowe Avenue Surface Treatment Footway Complete 24/03/2023
Aspley Amersham Rise Surface Treatment Footway Complete 29/03/2023
Aspley Camborne Drive Surface Treatment Footway Complete 03/04/2023
Aspley Commodore Gardens Surface Treatment Footway Complete 06/04/2023
Aspley Bramley Road Surface Treatment Footway Complete 07/04/2023
Aspley Planned Patching Resurface Carriageway Complete 30/06/2023
Basford Bulwell Lane Resurface Carriageway Complete 17/11/2022
Basford Heathfield Primary (Scotland Road) School Safety Scheme Traffic and Safety Programmed 12/02/2024
Basford Bin Replacement Clean and Green Clean and Green Complete 01/08/2023
Basford Tree Works Clean and Green Clean and Green Complete 01/08/2023
Basford School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Basford Bramble Close Surface Treatment Carriageway Complete 22/03/2023
Basford B682 Road Safety Scheme Traffic and Safety In Development To Be Confirmed
Basford Greenwich Avenue Surface Treatment Carriageway Complete 02/05/2023
Basford Planned Patching Resurface Carriageway Complete 30/06/2023
Basford Brittania Avenue (Patching) Resurface Carriageway Complete 01/11/2023
Berridge Tettenbury Road Resurface Footway Complete 16/11/2022
Berridge Girton Road Surface Treatment Footway Complete 03/04/2023
Berridge Cairo Street Surface Treatment Footway Complete 05/04/2023
Berridge Berridge Road East Surface Treatment Carriageway Complete 28/04/2023
Berridge Central Avenue Surface Treatment Carriageway Complete 08/11/2023
Berridge B682 Road Safety Scheme Traffic and Safety Complete 28/08/2023
Berridge Djanogly City Academy (SR) School Safety Scheme Traffic and Safety Complete 28/08/2023
Berridge Tree Works Clean and Green Clean and Green Complete 01/08/2023
Berridge School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 01/09/2023
Berridge Bin Replacement Clean and Green Clean and Green Complete 01/12/2023
Berridge Planned Patching Resurface Carriageway Complete 31/08/2023
Berridge Claremont Road / Mayo Road Resurface Footway Live 15/01/2024
Berridge Rockford Road Resurface Footway Complete 25/09/2023
Berridge Djanogly City Academy (Gregory Blvd) School Safety Scheme Traffic and Safety Complete 08/01/2024
Bestwood Raymede Close Surface Treatment Carriageway Complete 15/03/2023
Bestwood Raymede Drive Surface Treatment Carriageway Complete 16/03/2023
Bestwood Leybourne Drive Surface Treatment Carriageway Complete 19/03/2023
Bestwood Bin Replacement Clean and Green Clean and Green Complete 01/08/2023
Bestwood Tree Works Clean and Green Clean and Green Complete 01/08/2023
Bestwood Padstow Road Resurface Carriageway Complete 31/07/2023
Bestwood Planned Patching Resurface Carriageway Complete 31/07/2023
Bestwood Goathland / Broadwood / Bala /Trevino / Mosswood TRO Scheme Traffic and Safety Complete 31/08/2023
Bilborough Morris Road Resurface Carriageway Complete 02/02/2023
Bilborough Morris Road Resurface Footway Complete 02/02/2023
Bilborough Seagrave Road Surface Treatment Footway Complete 13/03/2023
Bilborough Burnwood Drive Surface Treatment Footway Complete 15/03/2023
Bilborough Mayland Close Surface Treatment Footway Complete 15/03/2023
Bilborough Denholme Road Surface Treatment Carriageway Complete 27/03/2023
Bilborough Stagsden Crescent Surface Treatment Carriageway Complete 27/03/2023
Bilborough Graylands Road Surface Treatment Carriageway Complete 28/03/2023
Bilborough Burnside Green Surface Treatment Carriageway Complete 05/05/2023
Bilborough Melbury Road Surface Treatment Carriageway Complete 07/05/2023
Bilborough St Martins Road Resurface Carriageway Complete 15/05/2023
Bilborough Planned Patching Resurface Carriageway Complete 30/06/2023
Bilborough Street Sweeper Street Sweeper Clean and Green Programmed 31/01/2024
Bilborough Urban Greening Clean and Green Clean and Green Complete 01/12/2023
Bilborough Tree Works Clean and Green Clean and Green Complete 01/12/2023
Bilborough Calveley Road/ Field House TRO Scheme Traffic and Safety Complete 14/02/2023
Bilborough Field House Close No Through Road Sign Traffic and Safety Complete 01/05/2023
Bilborough Hanslope Crescent Resurface Carriageway Complete 07/08/2023
Bilborough Bracebridge Drive (Patching) Surface Treatment Carriageway Complete 01/11/2023
Bilborough School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Bulwell Latham Street Surface Treatment Carriageway Complete 14/03/2023
Bulwell Stock Well Surface Treatment Carriageway Complete 15/03/2023
Bulwell Willow Hill Close Surface Treatment Carriageway Complete 15/03/2023
Bulwell Wingbourne Walk Surface Treatment Carriageway Complete 03/05/2023
Bulwell Stand on Mower x 4 Stand on mower Clean and Green Complete 01/10/2023
Bulwell Bin Replacement Clean and Green Clean and Green Complete 05/10/2023
Bulwell Urban Greening Clean and Green Clean and Green Complete 01/11/2023
Bulwell Tree Works Clean and Green Clean and Green Complete 01/09/2023
Bulwell Bestwood Road Bollards Traffic and Safety Complete 01/04/2023
Bulwell Gresley / Springhll/ South Snape / Dunholme Ward Area TRO Traffic and Safety Complete 01/04/2023
Bulwell Snapewood Area Resurface Carriageway Complete 23/10/2023
Bulwell School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Bulwell Lilington road Knee Rail Verge Complete 01/08/2023
Bulwell Lime Kiln Court Resurface Carriageway Complete 15/01/2024
Bulwell Aspen Road Area Micro Asphalt Carriageway Programmed 19/02/2024
Bulwell Dogswood Avenue CDS Resurface Carriageway Programmed 19/02/2024
Bulwell Forest Church Lane Resurface Carriageway Complete 14/11/2022
Bulwell Forest Planned Patching Resurface Carriageway Complete 31/07/2023
Bulwell Forest Bestwood Park Drive West Resurface Carriageway Complete 14/08/2023
Bulwell Forest Highbury Road Resurface Carriageway Complete 21/08/2023
Bulwell Forest Bin Replacement Clean and Green Clean and Green Complete 05/10/2023
Bulwell Forest Tree Works Clean and Green Clean and Green Complete 01/12/2023
Bulwell Forest Heathfield Primary (Kersall Road) School Safety Scheme Traffic and Safety Complete 31/07/2023
Bulwell Forest St Albans Road Resurface Carriageway Complete 06/10/2023
Bulwell Forest School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Castle Ward lining Lining Lining Complete 01/02/2023
Castle Upper College Street Surface Treatment Carriageway Complete 01/04/2023
Castle Lenton Road Resurface Carriageway Complete 01/04/2023
Castle East Circus Street Surface Treatment Carriageway Complete 02/04/2023
Castle North Circus Street Surface Treatment Carriageway Complete 02/04/2023
Castle Standard Hill Resurface Carriageway Complete 25/05/2023
Castle Mount Street Resurface Carriageway Complete 05/08/2023
Castle Major Tree Works (Castle Blvd) Clean and Green Clean and Green Complete 01/03/2023
Castle Urban Greening Clean and Green Clean and Green Programmed 01/02/2024
Castle Bin Replacement Clean and Green Clean and Green Complete 01/12/2023
Castle Tree Works Clean and Green Clean and Green Complete 01/08/2023
Castle Dropped Kerbs Dropped Kerbs Footway In Development To Be Confirmed
Clifton East Planned Patching Resurface Carriageway Complete 01/03/2023
Clifton East Summerwood Lane Surface Treatment Footway Complete 20/03/2023
Clifton East Summerwood Lane Surface Treatment Carriageway Complete 27/04/2023
Clifton East Green Lane Resurface Carriageway Complete 21/08/2023
Clifton East Tree Works Clean and Green Clean and Green Complete 01/10/2023
Clifton East Bin Replacement Clean and Green Clean and Green Complete 01/12/2023
Clifton East School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Clifton East 20mph Area Limit Road Safety Traffic and Safety Complete 26/01/2024
Clifton West Fabis Drive Surface Treatment Carriageway Complete 24/04/2023
Clifton West Collingwood Close Surface Treatment Carriageway Complete 25/04/2023
Clifton West Hockerwood Resurface Carriageway Complete 26/04/2023
Clifton West Holly Avenue Resurface Carriageway Complete 03/08/2023
Clifton West Tree Works Clean and Green Clean and Green Complete 20/11/2023
Clifton West Bin Replacement Clean and Green Clean and Green Complete 01/12/2023
Clifton West Hartness / St Irvan /Raleigh Ward Area TRO Traffic and Safety Complete 01/08/2023
Clifton West School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Clifton West Slaidburn Avenue Resurface Footway In Development To Be Confirmed
Clifton West Vernon Avenue Resurface Footway Complete 04/12/2023
Clifton West Chaceley Way Resurface Footway Live 22/01/2024
Clifton West Moss Side Resurface Footway Live 15/01/2024
Clifton West Sturgeon Avenue Resurface Footway In Development To Be Confirmed
Dales Parkdale Road Resurface Carriageway Complete 19/09/2022
Dales Planned Patching Resurface Carriageway Complete 01/04/2023
Dales Tree Works Clean and Green Clean and Green Complete 01/08/2023
Dales Urban Greening Clean and Green Clean and Green Complete 05/10/2023
Dales Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
Dales Highcliffe Road Resurface Carriageway Complete 31/07/2023
Dales Road Signs Road Signs Carriageway Complete 01/08/2023
Dales Cranthorne Drive Street Safety Schemes Traffic and Safety Complete 26/01/2024
Hyson Green & Arboretum Plantation Side Resurface Carriageway Complete 10/10/2022
Hyson Green & Arboretum Chadwick Road Surface Treatment Carriageway Complete 23/03/2023
Hyson Green & Arboretum Chaucer Street Surface Treatment Carriageway Complete 04/04/2023
Hyson Green & Arboretum Gill Street Surface Treatment Carriageway Complete 05/04/2023
Hyson Green & Arboretum Planned Patching Resurface Carriageway Complete 30/06/2023
Hyson Green & Arboretum Tree Works Clean and Green Clean and Green Complete 01/09/2023
Hyson Green & Arboretum Bin Replacement Clean and Green Clean and Green Complete 01/12/2023
Hyson Green & Arboretum School Keep Clear Markings School Safety Scheme Traffic and Safety Complete 31/08/2023
Hyson Green & Arboretum Burford Road Vehicle Survey Carriageway Complete 01/08/2023
Hyson Green & Arboretum Cromwell / Hubert / Berridge / Gamble Ward Area TRO Traffic and Safety Complete 01/12/2023
Hyson Green & Arboretum Bentinck Road Resurface Carriageway Complete 14/08/2023
Hyson Green & Arboretum Burford Road Resurface Carriageway Live 22/01/2024
Hyson Green & Arboretum Burns Street Resurface Footway Programmed 05/02/2024
Hyson Green & Arboretum Dryden Street Resurface Footway Complete 13/11/2023
Hyson Green & Arboretum Lawson Street Resurface Footway Complete 02/01/2024
Leen Valley Annan Court Surface Treatment Footway Complete 27/03/2023
Leen Valley Kirtle Close Surface Treatment Footway Complete 28/03/2023
Leen Valley Robins Wood Road Resurface Carriageway Complete 31/07/2023
Leen Valley Bin Replacement Clean and Green Clean and Green Complete 04/09/2023
Leen Valley Nuthall / Beechdale / Western Blvd Ward Area TRO Traffic and Safety Complete 01/12/2023
Leen Valley Western Boulevard Better Parking Scheme Traffic and Safety Complete 01/12/2023
Leen Valley Planned Patching Patching Carriageway In Development To Be Confirmed
Leen Valley School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Lenton & Wollaton East Willoughby Street Retread Carriageway Programmed 02/03/2024
Lenton & Wollaton East Broughton Drive Resurface Carriageway Complete 09/01/2023
Lenton & Wollaton East Martinmass Close Surface Treatment Carriageway Complete 28/03/2023
Lenton & Wollaton East Arnesby Road Surface Treatment Carriageway Complete 29/03/2023
Lenton & Wollaton East Ingham Grove Surface Treatment Carriageway Complete 29/03/2023
Lenton & Wollaton East Rathmines Close Surface Treatment Carriageway Complete 31/03/2023
Lenton & Wollaton East Church Street Surface Treatment Carriageway Complete 07/05/2023
Lenton & Wollaton East Planned Patching Resurface Carriageway Complete 06/06/2023
Lenton & Wollaton East Anslow Avenue Resurface Carriageway Complete 26/06/2023
Lenton & Wollaton East Tree Works Clean and Green Clean and Green Complete 20/11/2023
Lenton & Wollaton East Major Tree Works (Lenton Blvd) Clean and Green Clean and Green Complete 01/10/2023
Lenton & Wollaton East Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
Lenton & Wollaton East Marlborough / Hart / Church Ward Area TRO Traffic and Safety Complete 01/12/2023
Lenton & Wollaton East School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Mapperley Brewsters Road Resurface Carriageway Complete 06/02/2023
Mapperley Pearmain Drive Surface Treatment Carriageway Complete 11/04/2023
Mapperley Mickleborough Avenue Surface Treatment Carriageway Complete 13/04/2023
Mapperley Wharton Avenue Surface Treatment Carriageway Complete 13/04/2023
Mapperley Sherwood Vale Resurface Carriageway Complete 17/04/2023
Mapperley Planned Patching Resurface Carriageway Complete 24/05/2023
Mapperley Tree Works Clean and Green Clean and Green Complete 01/08/2023
Mapperley Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
Mapperley Ockbrook / Astley  / City Heights Ward Area TRO Traffic and Safety Complete 03/03/2023
Mapperley The Wells Academy School Safety Scheme Traffic and Safety Complete 19/06/2023
Mapperley School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Meadows St Saviours Gardens Surface Treatment Footway Complete 16/03/2023
Meadows Hartford Close Surface Treatment Footway Complete 17/03/2023
Meadows Soudan Drive Surface Treatment Footway Complete 17/03/2023
Meadows Briar Court Surface Treatment Footway Complete 20/03/2023
Meadows Colliery Close Surface Treatment Footway Complete 20/03/2023
Meadows Kinglake Place Surface Treatment Footway Complete 05/04/2023
Meadows Anmer Close Surface Treatment Carriageway Complete 19/04/2023
Meadows Ayton Close Surface Treatment Carriageway Complete 19/04/2023
Meadows Muskham Street Surface Treatment Carriageway Complete 20/04/2023
Meadows Oxbow Close Surface Treatment Carriageway Complete 20/04/2023
Meadows Collygate Road Surface Treatment Carriageway Complete 21/04/2023
Meadows Radcliffe Street Surface Treatment Carriageway Complete 21/04/2023
Meadows Wilford Crescent West Resurface Carriageway Complete 11/05/2023
Meadows Bunbury Street Surface Treatment Carriageway Complete 08/11/2023
Meadows Tree Works Clean and Green Clean and Green Complete 01/09/2023
Meadows Urban Greening Clean and Green Clean and Green Programmed 01/02/2024
Meadows Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
Meadows Bathley Street Resurface Carriageway Programmed 11/03/2024
Meadows Robin Hood Way 20mph reminders Traffic and Safety Complete 13/02/2023
Radford Major Tree Works (Radford Blvd) Clean and Green Clean and Green Complete 01/03/2023
Radford Tree Works Clean and Green Clean and Green Complete 01/08/2023
Radford Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
Radford Street Sweeper Clean and Green Clean and Green Programmed 01/02/2024
Radford Ward Scheme TRO Scheme Traffic and Safety Complete 01/08/2023
Radford Mellors School School Safety Scheme Traffic and Safety Programmed 12/02/2024
Radford Hartley Road Resurface Carriageway Complete 30/10/2023
Radford Ilkeston Road Resurface Carriageway Programmed 12/02/2024
Radford School Keep Clear Markings School Safety Scheme Traffic and Safety Complete 31/08/2023
Sherwood Street Sweeper Clean and Green Clean and Green Programmed 31/01/2024
Sherwood Tree Works Clean and Green Clean and Green Complete 01/08/2023
Sherwood Bedale Road Resurface Carriageway Programmed 19/02/2024
Sherwood Connecting Sherwood Resurface Carriageway In Development To Be Confirmed
Sherwood Aubrey Road Resurface Carriageway Programmed 19/02/2024
Sherwood Hardwick Road Resurface Carriageway Programmed 19/02/2024
Sherwood Hillview Avenue Resurface Carriageway Programmed 19/02/2024
Sherwood Cavendish Vale Resurface Carriageway Programmed 19/02/2024
Sherwood Cavenidish Avenue Resurface Carriageway Programmed 19/02/2024
Sherwood Ramsdale Avenue Resurface Carriageway Programmed 19/02/2024
Sherwood Ward Area TRO Ward Area TRO Traffic and Safety Complete 26/01/2024
St. Anns Alfred Street North Surface Treatment Carriageway Complete 05/04/2023
St. Anns Aster Road Surface Treatment Carriageway Complete 06/04/2023
St. Anns Elford Rise Surface Treatment Carriageway Complete 15/04/2023
St. Anns Walker Street Surface Treatment Carriageway Complete 16/04/2023
St. Anns Paxton Gardens Surface Treatment Carriageway Complete 17/04/2023
St. Anns Plantagenet Court Surface Treatment Carriageway Complete 18/04/2023
St. Anns Broad Oak Close Resurface Carriageway Complete 24/04/2023
St. Anns Lamartine Street Resurface Carriageway Complete 26/04/2023
St. Anns Planned Patching Resurface Carriageway Complete 28/04/2023
St. Anns Anstey Rise Resurface Carriageway Complete 14/06/2023
St. Anns Chedworth Close Resurface Carriageway Complete 29/08/2023
St. Anns Tree Works Clean and Green Clean and Green Live 01/09/2023
St. Anns Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
St. Anns Rossington / Norland / Matlock / Bluebell TRO Schemes Traffic and Safety Complete 01/12/2023
St. Anns Bond Street Resurface Carriageway Programmed 19/02/2024
St. Anns West Street Resurface Carriageway Programmed 19/02/2024
St. Anns School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023
Wollaton West Tree Works Clean and Green Clean and Green Live 01/09/2023
Wollaton West Bin Replacement Clean and Green Clean and Green In Development To Be Confirmed
Wollaton West Lambourne Drive Resurface Footway Complete 18/09/2023
Wollaton West Ranelagh Grove Resurface Footway Complete 21/08/2023
Wollaton West Runswick Drive Resurface Footway Complete 27/10/2023
Wollaton West Woodland Road Ward Area TRO Traffic and Safety Complete 02/05/2023
Wollaton West Hambleton Drive / Heckington Drive Resurface Footway Complete 15/01/2024
Wollaton West School Keep Clear Markings Safer Parking Scheme Traffic and Safety Complete 31/08/2023

Full resurfacing

Fully resurfacing a road is the complete replacement of the road surface. This can take between a few days or weeks depending on the length of road being resurfaced.

How will this affect residents?

Affected residents will be notified by leaflet in advance of the works and via on-street notices. Signed diversions will be in place for through traffic and access for residents will be maintained at all times.

Before and after picture showing road resurfacing Sneinton Blvd

Microsurfacing

Every year we complete a programme of road maintenance in neighbourhoods which seals and waterproofs the surface to help protect the road from further damage.

On the streets due for microsurfacing the existing surface will be overlaid using a specialist vehicle with a mix of bitumen and aggregate. This process is known as ‘microsurfacing’ and helps prolong the life of the road surface.

Microsurfacing is a vital preventative measure which slows the deterioration of the surface and keeps the roads in good condition reducing the need for more substantial and costly repairs. Our annual maintenance programme aims to stay ahead of the game, and help keep Nottingham moving by preserving a smooth and safe surface.

Micro surfacing

How does this affect residents?

Affected residents will be notified by leaflet in advance of the works and via on-street notices.

The process is quite quick and can be completed in a few hours but the road does need to be clear of parked vehicles before work can begin. Residents on the affected streets will be notified and we will work to provide ad hoc access if required during the works.

Please ensure any vehicles you own or are responsible for are removed from the road between 07:30 and 16:30 whilst the work is being carried out. This will allow the process to move much more smoothly.

 

Slurry Seal

Sealing the footway with a new top layer that will cost effectively increase the service life of the footpath.

How will this affect residents?

Affected residents will be notified by leaflet in advance of the works and via on-street notices.

The pavement will be closed while work takes place but a safe, signed diversion will be in place. Work should not impact residents vehicle access for the most part except for when work is immediately outside of a property. Residents on the affected streets will be notified and we will work to provide ad hoc access if required during the works.

Pavement resurfacing slurry seal

 

Patching

This is repairing sections of the road that have seen significant damage/ware as well as proactively replacing sections of the road before they become potholes or other defects.

Read more about potholes here.

How will this affect residents?

Affected residents will be notified by leaflet in advance of the works and via on-street notices. Access to properties will be maintained at all times.

 

Retread

Used on roads, the retread process recycles the existing road surface in situ to form a durable flexible road surface. It is then overlaid with a micro asphalt surface course which seals out water to prolong the life of the road surface. Retread is versatile and works to existing kerb and ironwork levels, meaning pre-patching work can be avoided. Drainage issues can often be resolved when re-profiling the road. Alternative surface treatments can be used to finish the site. Time required on site is significantly reduced in comparison to conventional road resurfacing, reducing overall disruption to both residents and the network. With increasing focus on sustainability, the retread process offers a low CO2 alternative by reducing the output of energy, emissions and waste.

How will this affect residents?

Affected residents will be notified by leaflet in advance of the works and via on-street notices. Signed diversions will be in place for through traffic and access for residents will be maintained at all times.