WardRoadTypeInfoStart DateWork Stream
AspleyFenwick RoadResurfaceComplete20/01/2025SfP 24/25
AspleyDeepdene WayResurfaceComplete18/11/2024SfP 24/25
AspleyWinsford CloseResurfaceComplete13/01/2025SfP 24/25
AspleyMaltby CloseResurfaceComplete13/01/2025SfP 24/25
AspleyMaltby CloseResurfaceComplete13/01/2025SfP 24/25
AspleyLimetree AvenueResidents Parking Scheme Complete 15/06/2025SfP 24/25
AspleyWard wide Bin ReplacementComplete10/02/2025SfP 24/25
AspleyTiverton CloseFootway ResurfaceComplete13/01/2025SfP 24/25
AspleyWard Wide Planned PatchingComplete01/02/2025SfP 24/25
BasfordMount PleasantMicro AsphaltComplete07/06/2024LTP 24/25
BasfordMarlowe AvenueMicro AsphaltComplete07/06/2024LTP 24/25
BasfordWhitemoor RoadMicro AsphaltComplete08/04/2024LTP 24/25
BasfordAlpine StreetMicro AsphaltComplete09/04/2024LTP 24/25
BasfordStockhill LaneMicro AsphaltComplete11/04/2024LTP 24/25
BasfordBulwell LaneResurfaceComplete06/07/2025SfP 24/25
BasfordHeatherly DriveResurfaceComplete10/02/2025SfP 24/25
BasfordBroadhurst AvenueResurfaceComplete21/01/2025SfP 24/25
BasfordPercy StreetMicro AsphaltComplete10/04/2024LTP 24/25
BasfordWard Wide Parking RestrictionsOn site 30/09/2025SfP 24/25
BasfordPark Lane 2 New Bollards Complete15/01/2025SfP 24/25
BasfordWard Wide Bin ReplacementComplete17/02/2025SfP 24/25
BerridgeLamcote StreetMicro AsphaltComplete03/04/2024LTP 24/25
BerridgeSecond AvenueMicro AsphaltComplete06/04/2024LTP 24/25
BerridgeGladstone StreetMicro AsphaltComplete07/04/2024LTP 24/25
BerridgePremier RoadMicro AsphaltComplete07/04/2024LTP 24/25
BerridgeMaxwell CloseMicro AsphaltComplete05/04/2024LTP 24/25
BerridgeHadbury RoadResurfaceComplete24/02/2025SfP 24/25
BerridgeEgypt RoadResurfaceComplete03/02/2025SfP 24/25
BerridgeSuez Street AreaDropped Crossing ImprovementsComplete 19/08/2025SfP 24/25
BerridgeWard Wide Parking RestrictionsOn site 01/08/2025SfP 24/25
BerridgeWimbledon Road AreaResident Parking Scheme and Parking RestrictionsComplete Autumn 2025SfP 24/25
BestwoodLytham GardensMicro AsphaltComplete17/04/2024LTP 24/25
BestwoodMildenhall CrescentResurfaceComplete17/02/2025SfP 24/25
BestwoodSouthglade Road ResurfaceComplete28/07/2025SfP 24/25
BestwoodCottam Drive / Cottam GardensMicro AsphaltComplete17/03/2025SfP 24/25
BestwoodElmbridgeMicro AsphaltComplete26/03/2025SfP 24/25
BestwoodWard Wide Planned PatchingComplete01/12/2024SfP 24/25
BestwoodWard Wide Bin ReplacementComplete24/02/2025SfP 24/25
BilboroughStrelley RoadResurfaceComplete17/02/2025LTP 24/25
BilboroughChingford RoadResurfaceComplete31/07/2025SfP 24/25
BilboroughWoodhouse WayResurfaceComplete06/05/2025SfP 24/25
BilboroughBurnside RoadMicro AsphaltComplete24/03/2025SfP 24/25
BilboroughGlaisdale DrivePlanned Patching CompleteSummer 2025SfP 24/25
BilboroughWollaton ValeFootway ResurfaceComplete30/06/2025SfP 24/25
BulwellSquires AvenueResurfaceComplete07/04/2025SfP 24/25
BulwellLime Street / Muriel StreetResurfaceComplete29/11/2024SfP 24/25
BulwellSquires AvenueResurfaceComplete02/04/2025SfP 24/25
BulwellArmstrong RoadMicro AsphaltComplete22/03/2025SfP 24/25
BulwellWard wide Planned PatchingComplete01/12/2024SfP 24/25
Bulwell ForestBrora RoadMicro AsphaltComplete16/04/2024LTP 24/25
Bulwell ForestRidgewayResurfaceComplete03/03/2025SfP 24/25
Bulwell ForestSt Albans Road ResurfaceComplete25/08/2025SfP 24/25
Bulwell ForestBestwood Road Retread Complete27/03/2025SfP 24/25
Bulwell ForestPiccadillyPlanned PatchingComplete01/02/2025SfP 24/25
Bulwell ForestBelmont Avenue Retread Complete26/03/2025SfP 24/25
Bulwell ForestTorkard Drive/Old Farm RoadDropped Crossing ImprovementsComplete 18/08/2025SfP 24/25
Bulwell ForestWard Wide Planned PatchingComplete Summer 2025SfP 24/25
CastlePlumptre StreetResurfaceComplete10/03/2025SfP 24/25
CastleSt James's TerraceResurfaceComplete15/03/2025SfP 24/25
CastleOld Lenton StreetJunction RealignmentComplete15/09/2025SfP 24/25
CastleWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
CastleWard Wide New Trees/Urban Greening Complete Summer 2025SfP 24/25
Clifton EastDungannon RoadResurfaceComplete30/07/2025SfP 24/25
Clifton EastClifton LaneResurfaceComplete14/07/2025SfP 24/25
Clifton EastOldoak RoadResurfaceComplete22/11/2024SfP 24/25
Clifton EastGreencroft AreaResidents Parking SchemeComplete Summer 2025SfP 24/25
Clifton EastFarnborough RoadRaised Plateau ResurfacingComplete23/06/2025SfP 24/25
Clifton EastWard wide Bin ReplacementComplete01/08/2025SfP 24/25
Clifton EastMiddlefell WaySlurry SealComplete18/03/2025SfP 24/25
Clifton NorthRuddington LaneMicro AsphaltComplete21/04/2024LTP 24/25
Clifton WestVillage RoadRetreadComplete26/03/2025LTP 24/25
Clifton WestBrookthorpe WayMicro AsphaltComplete19/03/2025SfP 24/25
Clifton WestPieris DriveMicro AsphaltComplete18/03/2025SfP 24/25
Clifton WestHolgateRetreadComplete26/03/2025SfP 24/25
DalesCardale RoadResurfaceComplete19/08/2024LTP 24/25
DalesHereford RoadRetreadComplete24/03/2025SfP 24/25
DalesHereford RoadResurfaceComplete23/07/2025SfP 24/25
DalesDaleview RoadRetreadComplete31/03/2025SfP 24/25
DalesBewick Drive AreaDropped Crossing ImprovementsComplete07/08/2025SfP 24/25
HGAIreton StreetMicro AsphaltComplete06/04/2024LTP 24/25
HGABentinck RoadResurfaceComplete07/10/2024LTP 24/25
HGANewstead GroveResurfaceComplete27/01/2025SfP 24/25
HGAA610 Bobbers Mill Bridge Road Safety Improvements In DevelopmentSpring 2026SfP 24/25
HGADarley Road and Darley Avenue Micro AsphaltComplete17/03/2025SfP 24/25
HGAKnighton AvenueMicro AsphaltComplete25/03/2025SfP 24/25
HGAWard Wide Planned Patching Complete12/12/2024SfP 24/25
HGAGill Street Dropped Crossing ImprovementsComplete11/08/2025SfP 24/25
HGAWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
Leen ValleyBeechdale RoadHFSComplete01/11/2024LTP 24/25
Leen ValleyAspley LaneMicro AsphaltComplete18/04/2024LTP 24/25
Leen ValleyHolbeck RoadResurfaceComplete01/11/2024LTP 24/25
Leen ValleyWilkinson StreetResurfaceComplete23/09/2024LTP 24/25
Leen ValleyTrentham DriveResurfaceComplete20/03/2025SfP 24/25
Leen ValleyWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
Leen ValleyWard Wide Planned Patching Complete01/12/2024SfP 24/25
LWEGregory StreetMicro AsphaltComplete20/04/2024LTP 24/25
LWELenton LaneMicro AsphaltComplete02/04/2024LTP 24/25
LWEHawton CrescentResurfaceComplete07/04/2025SfP 24/25
LWENewland CloseResurfaceComplete14/03/2025SfP 24/25
LWETrinity Avenue / Church Avenue / Albert Road / Lois AvenueMicro AsphaltComplete22/03/2025SfP 24/25
LWEScalford DriveMicro AsphaltComplete21/03/2025SfP 24/25
LWEBroughton Drive/Austrey AvenueParking Restrictions CompleteSummer 2025SfP 24/25
MapperleyDagmar GroveMicro AsphaltComplete04/04/2024LTP 24/25
MapperleyMapperley RoadMicro AsphaltComplete04/04/2024LTP 24/25
MapperleyMapperley RiseMicro AsphaltComplete03/04/2024LTP 24/25
MapperleySpringwood GardensRetreadComplete25/03/2025LTP 24/25
MapperleyBrewsters Road ResurfaceComplete24/02/2025SfP 24/25
MapperleyBoynton RoadMicro AsphaltComplete23/03/2025SfP 24/25
MapperleyWoodlane GardensMicro AsphaltComplete23/03/2025SfP 24/25
MapperleyEaton StreetMicro AsphaltComplete23/03/2025SfP 24/25
MeadowsQueens Drive (Phase 1)ResurfaceComplete09/09/2024LTP 24/25
MeadowsQueens Drive (Phase 2)ResurfaceComplete04/11/2024LTP 24/25
MeadowsBathley StreetResurfaceComplete11/03/2025SfP 24/25
MeadowsQueen's Road New Pedestrian Crossing Complete 28/07/2025SfP 24/25
MeadowsQuayside Close/ Meadows Close and Beauvale Road Residents Parking SchemeIn DevelopmentAutumn 2025SfP 24/25
MeadowsBunbury StreetMicro AsphaltComplete21/03/2025SfP 24/25
MeadowsBurge CloseMicro AsphaltComplete21/03/2025SfP 24/25
MeadowsBathley StreetSlurry SealComplete04/03/2025SfP 24/25
MeadowsRobin Hood WayFootpath Improvements Complete 01/08/2025SfP 24/25
MeadowsColliery Close Surfacing and Drainage Improvements Complete02/06/2025SfP 24/25
RadfordSalisbury StreetMicro AsphaltComplete09/04/2024LTP 24/25
RadfordSalisbury SquareMicro AsphaltComplete09/04/2024LTP 24/25
RadfordMiddleton StreetMicro AsphaltComplete09/04/2024LTP 24/25
RadfordMiall StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordBright StreetMicro AsphaltComplete08/04/2024LTP 24/25
RadfordWellington SquareMicro AsphaltComplete06/04/2024LTP 24/25
RadfordFaraday RoadMicro AsphaltComplete10/04/2024LTP 24/25
RadfordGarden StreetMicro AsphaltComplete07/04/2024LTP 24/25
RadfordBalfour RoadResurfaceComplete10/03/2025SfP 24/25
RadfordDouglas RoadResurfaceComplete24/03/2025SfP 24/25
RadfordNorton StreetMicro AsphaltComplete22/03/2025SfP 24/25
RadfordArgyle StreetMicro AsphaltComplete24/03/2025SfP 24/25
RadfordWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
Basford & SherwoodValley RoadMicro AsphaltComplete18/03/2025LTP 24/25
SherwoodLongdale DriveResurfaceComplete12/08/2024LTP 24/25
SherwoodWhatton Rise / Bradmore RiseResurfaceComplete06/01/2025SfP 24/25
SherwoodMansfield Rd Area Residents Parking and Car Parks Scheme In DevelopmentSpring 2026SfP 24/25
SherwoodPerry Road Planned Patching Complete31/01/2025SfP 24/25
SherwoodLoscoe Road CyclewayComplete01/04/2025SfP 24/25
SherwoodWinchester Street CyclewayComplete18/06/2025SfP 24/25
SherwoodWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
St Ann'sRobin Hood StreetResurfaceComplete22/04/2025SfP 24/25
St Ann'sCardinal CloseResurfaceComplete13/12/2024SfP 24/25
St Ann'sTeak CloseResurfaceComplete18/12/2024SfP 24/25
St Ann'sKilbourn StreetResurfaceComplete10/03/2025SfP 24/25
St Ann'sConway Close ResurfaceComplete10/03/2025SfP 24/25
St Ann'sSherwin Walk Highway ImprovementsComplete02/06/2025SfP 24/25
St Ann'sWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
St Ann'sLotus CloseMicro AsphaltComplete24/03/2025SfP 24/25
St. AnnsCarlton RoadMicro AsphaltComplete02/04/2024LTP 24/25
St. AnnsLower Parliament StreetResurfaceComplete01/08/2024LTP 24/25
Wollaton WestSmithson DriveMicro AsphaltComplete17/04/2024LTP 24/25
Wollaton WestDovecote DriveMicro AsphaltComplete17/04/2024LTP 24/25
Wollaton WestGrangewood RoadMicro AsphaltComplete25/03/2025LTP 24/25
Wollaton WestWollaton Road (Access Road)Micro AsphaltComplete15/04/2024LTP 24/25
Wollaton WestWollaton Road ResurfaceComplete12/05/2025SfP 24/25
Wollaton WestRenfrew DriveRetreadComplete03/04/2025SfP 24/25
Wollaton WestWard Wide Bin ReplacementComplete01/08/2025SfP 24/25
AspleySherborne RoadResurfacingLive08/12/2025LTP 25/26
AspleyWithern RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
AspleyColeby RoadResurfacingIn DevelopmentTo Be ConfirmedLTP 25/26
BerridgeArno AvenueMicro AsphaltComplete25/03/2025LTP 25/26
BerridgeWiverton RoadMicro AsphaltComplete25/03/2025LTP 25/26
BasfordLlanberis GroveResurfacingComplete25/07/2025LTP 25/26
BasfordStoneycroft RoadResurfacingComplete17/11/2025EMCCA 25/26
BerridgeReigate RoadMicro AsphaltComplete19/08/2025EMCCA 25/26
BilboroughRosedale DriveMicro AsphaltComplete23/03/2025LTP 25/26
BerridgeSilverdale RoadMicro AsphaltComplete19/08/2025EMCCA 25/26
BerridgeExeter RoadResurfacingComplete10/11/2025LTP 25/26
BestwoodB6004 Arnold RoadMicro AsphaltComplete29/09/2025EMCCA 25/26
BestwoodSouthglade RoadResurfacingComplete28/07/2025LTP 25/26
BestwoodBeckhampton RoadResurfacingComplete13/10/2025LTP 25/26
BestwoodPrendwick GardensResurfacingComplete01/12/2025EMCCA 25/26
BilboroughWoodhouse WayResurfacingComplete13/10/2025LTP 25/26
BilboroughHucknall RoadMicro AsphaltIn DevelopmentTo Be ConfirmedLTP 24/25
BilboroughBracebridge DriveResurfacingComplete11/08/2025LTP 24/25
BulwellMinerva StreetMicro AsphaltComplete30/08/2025EMCCA 25/26
BulwellMerchant StreetMicro AsphaltComplete30/08/2025EMCCA 25/26
BulwellHazel StreetMicro AsphaltComplete30/08/2025EMCCA 25/26
LWESelston DriveRetreadComplete26/03/2025LTP 25/26
MapperleyMapperley Hall DriveRetreadComplete01/04/2025LTP 25/26
Wollaton WestRussell AvenueRetreadComplete28/03/2025LTP 25/26
BasfordBarlock RoadRetreadComplete08/04/2025LTP 25/26
Bulwell ForestShakespeare StreetResurfacingComplete11/08/2025LTP 24/25
Bulwell ForestBestwood Park Drive WestResurfacingProgrammed16/02/2026EMCCA 25/26
CastleClumber StreetResurfacingComplete04/08/2025LTP 24/25
CastleNuthall RoadResurfacingComplete07/07/2025LTP 24/25
Clifton EastWoodkirk RoadResurfacingComplete04/11/2025LTP 25/26
Clifton EastWrenthorpe ValeMicro AsphaltComplete12/08/2025EMCCA 25/26
Clifton EastCaister RoadMicro AsphaltComplete11/08/2025EMCCA 25/26
Clifton EastBlaise CloseMicro AsphaltComplete11/08/2025EMCCA 25/26
Clifton EastCerne CloseMicro AsphaltComplete11/08/2025EMCCA 25/26
Clifton WestBader RoadMicro AsphaltComplete13/08/2025EMCCA 25/26
Clifton WestAaron CloseMicro AsphaltComplete12/08/2025EMCCA 25/26
Clifton WestHannah CrescentMicro AsphaltComplete13/08/2025EMCCA 25/26
Clifton WestCribb CloseMicro AsphaltComplete13/08/2025EMCCA 25/26
DalesDaleside RoadResurfacingComplete02/09/2025LTP 25/26
DalesAvon RoadResurfacingComplete23/07/2025EMCCA 25/26
Leen ValleyBexleigh GardensMicro AsphaltComplete25/03/2025LTP 25/26
DalesBewick DriveMicro AsphaltComplete18/08/2025EMCCA 25/26
HGAColville StreetResurfacingComplete10/11/2025LTP 25/26
HGAHampden StreetResurfacingProgrammed19/01/2026EMCCA 25/26
RadfordDorking RoadMicro AsphaltComplete25/03/2025LTP 25/26
RadfordBovill StreetMicro AsphaltComplete26/03/2025LTP 25/26
RadfordGraham StreetMicro AsphaltComplete08/04/2025EMCCA 25/26
Leen ValleyWestern BoulevardResurfacingComplete07/07/2025LTP 24/25
Leen ValleyWilford Crescent EastResurfacingComplete15/09/2025LTP 24/25
MeadowsQueens DriveResurfacingProgrammed19/01/2026LTP 25/26
MeadowsSt Georges DriveMicro AsphaltComplete18/08/2025EMCCA 25/26
Wollaton WestGrangewood RoadMicro AsphaltComplete25/03/2025LTP 25/26
MeadowsKelso GardensMicro AsphaltComplete18/08/2025EMCCA 25/26
MeadowsBeardsley GardensMicro AsphaltComplete18/08/2025EMCCA 25/26
MeadowsSaffron GardensMicro AsphaltComplete14/08/2025EMCCA 25/26
MeadowsArleston DriveResurfacingComplete14/07/2025LTP 24/25
RadfordBastion StreetResurfacingComplete17/11/2025LTP 25/26
SherwoodPerry RoadResurfacingProgrammed09/02/2026LTP 25/26
SherwoodA6514 Valley RoadMicro AsphaltComplete26/08/2025EMCCA 25/26
SherwoodRaven AvenueMicro AsphaltComplete19/08/2025EMCCA 25/26
SherwoodAmpthill RiseMicro AsphaltComplete19/08/2025EMCCA 25/26
St AnnsPalmerston GardensResurfacingComplete20/11/2025EMCCA 25/26
AspleyBeckley Road ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordVernon RoadResurfacingProgrammed23/02/2026SfP 25/26
BasfordNewport DriveResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordBowness AvenueMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BasfordGreenwich Avenue Parking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
Berridge Charlesworth AvenueParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgePelham AvenueResurfacingProgrammed30/03/2026SfP 25/26
BerridgeWard WidePatchingIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgeMyrtle AvenueMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgeWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BerridgeWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BestwoodMorrell Bank ResurfacingComplete28/07/2025SfP 25/26
BestwoodElsworth Drive Micro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BestwoodBarent Close ResurfacingComplete28/07/2025SfP 25/26
BestwoodMorrell Bank Estate Public Realm ImprovementsIn DevelopmentTo Be ConfirmedSfP 25/26
Bestwood Ward WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughStrelley RoadResurfacingProgrammed02/03/2026SfP 25/26
BilboroughCockington RoadMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughGreystoke Drive AreaParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellSellerswood DriveResurfacingProgrammed16/02/2026SfP 25/26
BulwellBardney DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellBarry StreetMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellMoorbridge Cottages Parking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
BulwellHighbury RoadFootway ResurfaceIn DevelopmentTo Be ConfirmedSfP 25/26
Bulwell ForestBestwood Road RetreadIn DevelopmentTo Be ConfirmedSfP 25/26
Bulwell ForestFlaxton Way ResurfacingProgrammed02/03/2026SfP 25/26
Bulwell ForestRevelstoke Way PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
CastleHounds Gate Footway ResurfaceIn DevelopmentTo Be ConfirmedSfP 25/26
CastleWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
CastleWard WideDropped CrossingsIn DevelopmentTo Be ConfirmedSfP 25/26
CastleWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastFailsworth CloseMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastWoodkirk RoadMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastGardendale AvenueResidents Parking SchemeIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton EastWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton WestNobel Road, Hartness Road, Fabis Drive, Clifton Village, Lark Hill (New Rise)Speed RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
Clifton WestWilford Cross Roads Junction ImprovementsProgrammed 01/01/2026SfP 25/26
DalesHereford Road Footway ResurfaceProgrammed16/02/2026SfP 25/26
DalesColwick Road side roads/Meadow GroveParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
DalesWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
DalesNewark Crescent Dropped CrossingsIn DevelopmentTo Be ConfirmedSfP 25/26
DalesDragon Sculpture New BenchesIn DevelopmentTo Be ConfirmedSfP 25/26
DalesWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Dales Lord Nelson Street ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
HGABerridge Road CentralResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEOrston Drive ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWemyss GardensResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEScalford DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
LAWEWard Wide PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyAberford Avenue Micro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyCherry Wood Drive / Spean DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyDalemoor Gardens / Ascot Road / Glencairn DriveParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyOakwood DriveMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
Leen ValleyWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleySt Jude's AvenueResurfacingProgrammed09/02/2026SfP 25/26
MapperleyWard Wide PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleyWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
MapperleyTavistock DriveParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsRobin Hood WayRoad Safety ImprovementsIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsHobart CloseMicro AsphaltIn DevelopmentTo Be ConfirmedSfP 25/26
MeadowsWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordSt Peters Street Urban GreeningIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordDenman Street West ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
Radford174 Derby Road / St Peters Street / Lonsdale Road / Hartley RoadParking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
RadfordWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
SherwoodDevonshire Road ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
SherwoodWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
SherwoodHaydn Road Shops Cycle ParkingIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard Wide Parking RestrictoinsIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sLinnell Street ResurfacingProgrammed12/01/2026SfP 25/26
St Ann'sSerlby Rise PatchingIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard WideBin ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard WideTree ReplacementIn DevelopmentTo Be ConfirmedSfP 25/26
St Ann'sWard Wide New BenchesIn DevelopmentTo Be ConfirmedSfP 25/26
Wollaton WestBramcote Lane ResurfacingIn DevelopmentTo Be ConfirmedSfP 25/26
BilboroughGlaisdale ParkwayResurfacingProgrammed19/01/2026LTP 25/26

No related posts available at the moment.

Sign up to the transport newsletter

Roadworks bulletin every Friday
and monthly project updates.

Sign up for email updates

 

Enter your email address below to sign up for updates or to access your subscriber preferences.