Streets for People works

Nottingham City Council has approved £11million of improvements to make our neighbourhoods greener, safer, better places to get around.

In 2021, the council successfully bid as part of a competitive process for £18 million from the Government’s Levelling Up fund to improve streets and local town centres, and make walking and cycling easier and safer.

The money will be used to make some exciting changes in the next two years, with the biggest chunk of money going to the Streets for People programme.

The funding will be split between each ward, with areas most in need getting more funding. The works have been identified by local people and prioritised by ward councillors, and are due to be completed by March 2024.

Our transport teams will be:

  • Upgrading pavements and walkways to make them safer, especially taking into consideration the needs of older people and those with less mobility
  • Repairs to roads and cycle paths to help us improve traffic flow and safety, across all twenty wards

Below is the planned programme of works.

  • Check this page for the latest updates, including work delays due to weather or other issues
  • To search for your street, press ‘CTRL F’ on your keyboard and enter your street name. If your street name isn’t found, there are no works currently planned

Programme of works

Mapperley Magdala Road Resurface Carriageway Complete 01/06/2021
Bestwood Leybourne Drive Resurface Footway Complete 01/09/2022
Aspley Frinton Road Surface Treatment Carriageway Complete 10/10/2022
Hyson Green & Arboretum Plantation Side Resurface Carriageway Complete 10/10/2022
Lenton & Wollaton East Willow Road Resurface Carriageway Live 05/09/2022
Dales Parkdale Road Resurface Carriageway Live 19/09/2022
Aspley Eltham Drive Surface Treatment Carriageway Live 11/10/2022
Bulwell Forest Church Lane Resurface Footway Live 31/10/2022
Hyson Green & Arboretum Cope Street Resurface Carriageway Programmed 14/11/2022
Bulwell Forest Church Lane Resurface Carriageway Programmed 14/11/2022
Hyson Green & Arboretum Stoneleigh Street Surface Treatment Carriageway Programmed 15/11/2022
Berridge Tettenbury Road Resurface Footway Programmed 16/11/2022
Basford Bulwell Lane Resurface Carriageway Programmed 17/11/2022
Bilborough Morris Road Resurface Carriageway Programmed 24/11/2022
Bilborough St Martins Road Resurface Carriageway Programmed 05/12/2022
Bilborough Hanslope Crescent Resurface Carriageway Programmed 09/12/2022
Lenton & Wollaton East Broughton Drive Resurface Carriageway Programmed 12/12/2022
Lenton & Wollaton East Anslow Avenue Resurface Carriageway Programmed 14/12/2022
Aspley Lindfield Road Resurface Carriageway Programmed 04/01/2023
Aspley Lindbridge Road Resurface Carriageway Programmed 23/01/2023
Berridge Tettenbury Road Resurface Carriageway Programmed 25/01/2023
Mapperley Brewsters Road Resurface Carriageway Programmed 01/02/2023
Mapperley Sherwood Vale Resurface Carriageway Programmed 06/02/2023

 

Aspley Amersham Rise Surface Treatment Footway Programmed To Be Confirmed
Aspley Bramley Road Surface Treatment Footway Programmed To Be Confirmed
Aspley Broxtowe Avenue Surface Treatment Footway Programmed To Be Confirmed
Aspley Broxtowe Lane Resurface Footway Programmed To Be Confirmed
Aspley Camborne Drive Surface Treatment Footway Programmed To Be Confirmed
Aspley Commodore Gardens Surface Treatment Footway Programmed To Be Confirmed
Aspley Dulverton Vale Surface Treatment Footway Programmed To Be Confirmed
Aspley Hilcot Drive Surface Treatment Footway Programmed To Be Confirmed
Aspley Planned Patching Resurface Carriageway Programmed To Be Confirmed
Aspley Shepton Crescent Surface Treatment Footway Programmed To Be Confirmed
Aspley Wendover Drive Surface Treatment Footway Programmed To Be Confirmed
Basford Bramble Close Surface Treatment Carriageway Programmed To Be Confirmed
Basford Greenwich Avenue Surface Treatment Carriageway Programmed To Be Confirmed
Basford Ladbrooke Crescent Surface Treatment Footway Programmed To Be Confirmed
Basford Neston Drive Surface Treatment Footway Programmed To Be Confirmed
Basford Planned Patching Resurface Carriageway Programmed To Be Confirmed
Berridge Berridge Road East Surface Treatment Carriageway Programmed To Be Confirmed
Berridge Cairo Street Surface Treatment Footway Programmed To Be Confirmed
Berridge Central Avenue Surface Treatment Carriageway Programmed To Be Confirmed
Berridge Girton Road Surface Treatment Footway Programmed To Be Confirmed
Berridge Planned Patching Resurface Carriageway Programmed To Be Confirmed
Berridge Residual Spend Resurface Footway Programmed To Be Confirmed
Berridge Rockford Road Resurface Footway Programmed To Be Confirmed
Berridge Valmont Road Surface Treatment Footway Programmed To Be Confirmed
Bestwood Beckhampton Road Resurface Carriageway Programmed To Be Confirmed
Bestwood Hillington Rise FW Surface Treatment Footway Programmed To Be Confirmed
Bestwood Leybourne Drive Resurface Carriageway Programmed To Be Confirmed
Bestwood Planned Patching Resurface Carriageway Programmed To Be Confirmed
Bestwood Portland Court Surface Treatment Footway Programmed To Be Confirmed
Bestwood Queens Bower Road Surface Treatment Footway Programmed To Be Confirmed
Bestwood Raymede Close Surface Treatment Carriageway Programmed To Be Confirmed
Bestwood Raymede Drive Surface Treatment Carriageway Programmed To Be Confirmed
Bestwood Reedham Walk Surface Treatment Footway Programmed To Be Confirmed
Bestwood Thorpe Close Surface Treatment Footway Programmed To Be Confirmed
Bilborough Bracebridge Drive Surface Treatment Carriageway Programmed To Be Confirmed
Bilborough Burnside Green Surface Treatment Carriageway Programmed To Be Confirmed
Bilborough Burnwood Drive Surface Treatment Footway Programmed To Be Confirmed
Bilborough Denewood Crescent Surface Treatment Footway Programmed To Be Confirmed
Bilborough Denholme Road Surface Treatment Carriageway Programmed To Be Confirmed
Bilborough Graylands Road Surface Treatment Carriageway Programmed To Be Confirmed
Bilborough Greystoke Drive Surface Treatment Footway Programmed To Be Confirmed
Bilborough Mayland Close Surface Treatment Footway Programmed To Be Confirmed
Bilborough Melbury Road Surface Treatment Carriageway Programmed To Be Confirmed
Bilborough Morris Road Surface Treatment Footway Programmed To Be Confirmed
Bilborough Planned Patching Resurface Carriageway Programmed To Be Confirmed
Bilborough Seagrave Road Surface Treatment Footway Programmed To Be Confirmed
Bilborough Stagsden Crescent Surface Treatment Carriageway Programmed To Be Confirmed
Bulwell Hempshill Lane Resurface Footway Programmed To Be Confirmed
Bulwell Hethersett Gardens Surface Treatment Footway Programmed To Be Confirmed
Bulwell Latham Street Surface Treatment Carriageway Programmed To Be Confirmed
Bulwell Major Carriageway Resurfacing Resurface Carriageway Programmed To Be Confirmed
Bulwell Mersey Street Resurface Footway Programmed To Be Confirmed
Bulwell Rock Street Resurface Footway Programmed To Be Confirmed
Bulwell Saxelby Gardens Resurface Footway Programmed To Be Confirmed
Bulwell Stock Well Surface Treatment Carriageway Programmed To Be Confirmed
Bulwell Willow Hill Close Surface Treatment Carriageway Programmed To Be Confirmed
Bulwell Wingbourne Walk Surface Treatment Carriageway Programmed To Be Confirmed
Bulwell Forest Bestwood Park Drive West Resurface Carriageway Programmed To Be Confirmed
Bulwell Forest Cardington Close Surface Treatment Footway Programmed To Be Confirmed
Bulwell Forest Durham Crescent Resurface Footway Programmed To Be Confirmed
Bulwell Forest Highbury Road Resurface Carriageway Programmed To Be Confirmed
Bulwell Forest Planned Patching Resurface Carriageway Programmed To Be Confirmed
Bulwell Forest St Albans Road Resurface Carriageway Programmed To Be Confirmed
Bulwell Forest Stanstead Avenue Surface Treatment Footway Programmed To Be Confirmed
Castle College Street Surface Treatment Carriageway Programmed To Be Confirmed
Castle Dropped Kerbs Dropped Kerbs Footway Programmed To Be Confirmed
Castle East Circus Street Surface Treatment Carriageway Programmed To Be Confirmed
Castle Lenton Road Resurface Carriageway Programmed To Be Confirmed
Castle Mount Street Resurface Carriageway Programmed To Be Confirmed
Castle North Circus Street Surface Treatment Carriageway Programmed To Be Confirmed
Castle Pemberton Street Resurface Carriageway Programmed To Be Confirmed
Castle Regent Street Surface Treatment Carriageway Programmed To Be Confirmed
Castle Short Hill Resurface Carriageway Programmed To Be Confirmed
Castle Upper College Street Surface Treatment Carriageway Programmed To Be Confirmed
Clifton East Green Lane Resurface Carriageway Programmed To Be Confirmed
Clifton East Planned Patching Resurface Carriageway Programmed To Be Confirmed
Clifton East Summerwood Lane Surface Treatment Carriageway Programmed To Be Confirmed
Clifton East Summerwood Lane Surface Treatment Footway Programmed To Be Confirmed
Clifton West Collingwood Close Surface Treatment Carriageway Programmed To Be Confirmed
Clifton West Hockerwood Resurface Carriageway Programmed To Be Confirmed
Clifton West Planned Patching Resurface Carriageway Programmed To Be Confirmed
Clifton West Ruddington Lane Surface Treatment Carriageway Programmed To Be Confirmed
Clifton West Slaidburn Avenue Resurface Footway Programmed To Be Confirmed
Clifton West Vernon Avenue Resurface Footway Programmed To Be Confirmed
Dales Highcliffe Road Resurface Carriageway Programmed To Be Confirmed
Dales Planned Patching Resurface Carriageway Programmed To Be Confirmed
Dales Road Signs Road Signs Carriageway Programmed To Be Confirmed
Dales Watson Avenue Surface Treatment Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Bentinck Road Resurface Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Ashwell Gardens Surface Treatment Footway Programmed To Be Confirmed
Hyson Green & Arboretum Ben Street Surface Treatment Footway Programmed To Be Confirmed
Hyson Green & Arboretum Burford Road Resurface Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Burns Street Resurface Footway Programmed To Be Confirmed
Hyson Green & Arboretum Chadwick Road Surface Treatment Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Chaucer Street Surface Treatment Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Dryden Street Resurface Footway Programmed To Be Confirmed
Hyson Green & Arboretum Elmore Court Surface Treatment Footway Programmed To Be Confirmed
Hyson Green & Arboretum Gill Street Surface Treatment Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Hubert Street Surface Treatment Footway Programmed To Be Confirmed
Hyson Green & Arboretum Lake Street Surface Treatment Footway Programmed To Be Confirmed
Hyson Green & Arboretum Lawson Street Resurface Footway Programmed To Be Confirmed
Hyson Green & Arboretum Planned Patching Resurface Carriageway Programmed To Be Confirmed
Hyson Green & Arboretum Woodstock Avenue Surface Treatment Footway Programmed To Be Confirmed
Leen Valley Annan Court Surface Treatment Footway Programmed To Be Confirmed
Leen Valley Kirtle Close Surface Treatment Footway Programmed To Be Confirmed
Leen Valley Robins Wood Road Resurface Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Arnesby Road Surface Treatment Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Aston Avenue Surface Treatment Footway Programmed To Be Confirmed
Lenton & Wollaton East Austrey Avenue Surface Treatment Footway Programmed To Be Confirmed
Lenton & Wollaton East Church Street Surface Treatment Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Hawton Spinney Surface Treatment Footway Programmed To Be Confirmed
Lenton & Wollaton East Ingham Grove Surface Treatment Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Martinmass Close Surface Treatment Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Olton Avenue Surface Treatment Footway Programmed To Be Confirmed
Lenton & Wollaton East Planned Patching Resurface Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Rathmines Close Surface Treatment Carriageway Programmed To Be Confirmed
Lenton & Wollaton East Winster Close Surface Treatment Footway Programmed To Be Confirmed
Mapperley Mickleborough Avenue Surface Treatment Carriageway Programmed To Be Confirmed
Mapperley Pearmain Drive Surface Treatment Carriageway Programmed To Be Confirmed
Mapperley Planned Patching Resurface Carriageway Programmed To Be Confirmed
Mapperley Warton Avenue Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Anmer Close Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Ayton Close Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Briar Court Surface Treatment Footway Programmed To Be Confirmed
Meadows Bunbury Street Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Colliery Close Surface Treatment Footway Programmed To Be Confirmed
Meadows Collygate Road Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Hartford Close Surface Treatment Footway Programmed To Be Confirmed
Meadows Kinglake Place Surface Treatment Footway Programmed To Be Confirmed
Meadows Meadows ward Resurface Carriageway Programmed To Be Confirmed
Meadows Muskham Street Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Oxbow Close Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Radcliffe Street Surface Treatment Carriageway Programmed To Be Confirmed
Meadows Ryeland Gardens Surface Treatment Footway Programmed To Be Confirmed
Meadows Soudan Drive Surface Treatment Footway Programmed To Be Confirmed
Meadows St Saviours Gardens Surface Treatment Footway Programmed To Be Confirmed
Meadows Wilford Crescent East Resurface Carriageway Programmed To Be Confirmed
Meadows Wilford Crescent West Resurface Carriageway Programmed To Be Confirmed
Meadows Wilford Grove Resurface Carriageway Programmed To Be Confirmed
Radford Highway Maintenance Approval Resurface Carriageway Programmed To Be Confirmed
Sherwood Bedale Road Resurface Carriageway Programmed To Be Confirmed
Sherwood Connecting Sherwood Resurface Carriageway Programmed To Be Confirmed
St. Anns Alfred Street North Surface Treatment Carriageway Programmed To Be Confirmed
St. Anns Anstey Rise Resurface Carriageway Programmed To Be Confirmed
St. Anns Aster Road Surface Treatment Carriageway Programmed To Be Confirmed
St. Anns Bond Street Resurface Carriageway Programmed To Be Confirmed
St. Anns Bond Street Resurface Footway Programmed To Be Confirmed
St. Anns Broad Oak Close Resurface Carriageway Programmed To Be Confirmed
St. Anns Chedworth Close Resurface Carriageway Programmed To Be Confirmed
St. Anns Elford Rise Surface Treatment Carriageway Programmed To Be Confirmed
St. Anns Lamartine Street Resurface Carriageway Programmed To Be Confirmed
St. Anns Lowdham Street Surface Treatment Footway Programmed To Be Confirmed
St. Anns Nile Street Resurface Carriageway Programmed To Be Confirmed
St. Anns Paxton Gardens Surface Treatment Carriageway Programmed To Be Confirmed
St. Anns Planned Patching Resurface Carriageway Programmed To Be Confirmed
St. Anns Plantagenet Court Surface Treatment Carriageway Programmed To Be Confirmed
St. Anns Robin Hood Street Surface Treatment Footway Programmed To Be Confirmed
St. Anns Serlby Rise Resurface Footway Programmed To Be Confirmed
St. Anns Walker Street Surface Treatment Carriageway Programmed To Be Confirmed
St. Anns West Street Resurface Carriageway Programmed To Be Confirmed
St. Anns Windmill Lane Resurface Footway Programmed To Be Confirmed
Wollaton West Lambourne Drive Resurface Footway Programmed To Be Confirmed
Wollaton West Ranelagh Grove Resurface Footway Programmed To Be Confirmed
Wollaton West Remaining Footpath Allocation Resurface Footway Programmed To Be Confirmed
Wollaton West Runswick Drive Resurface Footway Programmed To Be Confirmed

 

Full resurfacing

Fully resurfacing a road is the complete replacement of the road surface. This can take between a few days or weeks depending on the length of road being resurfaced.

How will this affect residents?

Affected residents will be notified by leaflet in advance of the works and via on-street notices. Signed diversions will be in place for through traffic and access for residents will be maintained at all times.

Before and after picture showing road resurfacing Sneinton Blvd

Microsurfacing

Every year we complete a programme of road maintenance in neighbourhoods which seals and waterproofs the surface to help protect the road from further damage.

On the streets due for microsurfacing the existing surface will be overlaid using a specialist vehicle with a mix of bitumen and aggregate. This process is known as ‘microsurfacing’ and helps prolong the life of the road surface.

Microsurfacing is a vital preventative measure which slows the deterioration of the surface and keeps the roads in good condition reducing the need for more substantial and costly repairs. Our annual maintenance programme aims to stay ahead of the game, and help keep Nottingham moving by preserving a smooth and safe surface.

More on our microsurfacing programme here.

Micro surfacing

How does this affect residents?

Affected residents will be notified by letter in advance of the works and via on-street notices.

The process is quite quick and can be completed in a few hours but the road does need to be clear of parked vehicles before work can begin. Residents on the affected streets will be notified and we will work to provide ad hoc access if required during the works.

Please ensure any vehicles you own or are responsible for are removed from the road between 07:30 and 16:30 whilst the work is being carried out. This will allow the process to move much more smoothly.

 

Slurry Seal

Sealing the footway with a new top layer that will cost effectively increase the service life of the footpath.

How will this affect residents?

Affected residents will be notified by letter in advance of the works and via on-street notices.

The pavement will be closed while work takes place but a safe, signed diversion will be in place. Work should not impact residents vehicle access for the most part except for when work is immediately outside of a property. Residents on the affected streets will be notified and we will work to provide ad hoc access if required during the works.

Pavement resurfacing slurry seal

 

Patching

This is repairing sections of the road that have seen significant damage/ware as well as proactively replacing sections of the road before they become potholes or other defects.

Read more about potholes here.

How will this affect residents?

Affected residents will be notified by letter in advance of the works and via on-street notices. Access to properties will be maintained at all times.