Nuthall Road Improvements

In Progress

Improvements will be made to Nuthall Road from Monday 7 July until September.

The work will take part in phases and will require the road to close on certain dates which you can see on the plans below. The road closures will take place between 9:30am – 5pm on weekdays and 8am – 5pm on weekends.

This document shows where all the different phases of work will take place.

Frequently Asked Questions

What work is taking place?

  • Resurfacing the road
  • Replacing or relaying existing kerbs
  • New paving on side roads where required
  • Relaying of existing block paving in parking bays
  • Replacement of guardrail where required
  • New signs and sign posts
  • New bins
  • Removal of tree stumps
  • New tree pit areas around existing trees
  • Improvements to the footway where required including removal of cracked slabs

Why has this road been chosen to have work done?

The road was identified as requiring resurfacing through our Annual Engineering Inspection (AEI) conducted by qualified highway engineers.

How is this work being funded?

This work is being funded with the Local Transport Plan Maintenance Funding.

If you have any questions please email [email protected]

Related pages

WFP5394-Sherwood-Vale-21-1

Highways planned maintenance

Our transport teams will be making repairs to roads and cycle paths across all twenty wards to help improve traffic flow and safety.

Find out more
The-Ropewalk-2-e1559745850941-1024x775-1

Project information

More information on the different programmes and types of road treatment.

Find out more

Sign up to the transport newsletter

Roadworks bulletin every Friday
and monthly project updates.

Sign up for email updates

 

Enter your email address below to sign up for updates or to access your subscriber preferences.